Full Site - : siplace feeder change over tables (Page 17 of 19)

Re: real placement rates

Electronics Forum | Fri Jul 24 16:02:13 EDT 1998 | Justin Medernach

200 boards/Hr and oven will reflow ~180 boards/Hr but the P&P machine will only place 700-950 CPH | | | when setup is taken into account. Minimum pitch is normally .020" and we place an Avg. of 491 TSSOPs and 217 BGAs a month. | | | We don't even bo

HELP ON SANYO TCM-V822 HIGH SPEED MOUNTER

Electronics Forum | Fri Dec 02 17:28:35 EST 2005 | ratsalad

We have a TCM-V822 over in the warehouse that had a severe head crash. If you suspect you have a bad servopack, contact Unidec. They can test it for you. If it tests bad they can rebuild it for you and you won't have to wait for months to have o

Re: Thoughts on Universal GSM1/2 Anyone??

Electronics Forum | Wed Apr 29 14:03:40 EDT 1998 | Chrys

| We would like to add another pick and place machine to | the SMT line. We're low volume so we change the line over | after each group of boards. So far we've pretty much | ruled out Siplace in favor of the Universal machines. | Does anyone care to

Re: Vision Inspection Systems

Electronics Forum | Thu Apr 30 17:03:45 EDT 1998 | Ray N. Lopez Mata

| | | | | | | Hello - | | | | I am interested in obtaining information on the possibility of integrating a Vision Inspection System with an SMT line. I am aware of systems which may be used to gather placement data and such, but are there any system

Re: Performance estimation of SMT-assembly-Systems

Electronics Forum | Tue Aug 31 14:36:41 EDT 1999 | JohnW

| I'm in univerity research on SMT assembly systems. Especialy Simulation and Optimisation using OR-Methods. We developed flexible simulation models of various assembly-machines and use them for performance estimation (Components per hour) under diff

Re: Performance estimation of SMT-assembly-Systems

Electronics Forum | Wed Sep 01 05:44:18 EDT 1999 | Wolfgang Busko

| | I'm in univerity research on SMT assembly systems. Especialy Simulation and Optimisation using OR-Methods. We developed flexible simulation models of various assembly-machines and use them for performance estimation (Components per hour) under di


siplace feeder change over tables searches for Companies, Equipment, Machines, Suppliers & Information