Career Center | SAS NAGAR MOHALI, India | Production
PRODUCTION, MAINTENANCE, PROGRAMMING
Electronics Forum | Tue Apr 30 10:44:14 EDT 2019 | spoiltforchoice
You are a very confusing person, one minute you want to buy some cheap piece of crap and speed isn't all that important and now you want a Lambo! Different use cases will make different machines faster if optimised. Or for the rest of us they averag
Career Center | , | Maintenance
Specialized in Siemens equipment, and OmniExcel 7, MPM Ap25, Momentum.
Electronics Forum | Fri Jul 24 12:12:52 EDT 1998 | smd
200 boards/Hr and oven will reflow ~180 boards/Hr but the P&P machine will only place 700-950 CPH | | when setup is taken into account. Minimum pitch is normally .020" and we place an Avg. of 491 TSSOPs and 217 BGAs a month. | | We don't even bother
Electronics Forum | Fri Jul 24 16:02:13 EDT 1998 | Justin Medernach
200 boards/Hr and oven will reflow ~180 boards/Hr but the P&P machine will only place 700-950 CPH | | | when setup is taken into account. Minimum pitch is normally .020" and we place an Avg. of 491 TSSOPs and 217 BGAs a month. | | | We don't even bo
Career Center | ORLANDO, Florida USA | Engineering,Maintenance,Production,Technical Support
Manufacturing tech/eng for a contract manufacture for 10+ years. Been working in the SMT industry for a total of 20yrs. Have done everything from operator to process work. Most familiar with Assembleon, MPM, DEK, BTU,Electrovert, SLIM-KIC, SUPER-MOLE