Full Site - : timeout waiting for vacuum build up (Page 3 of 4)

Press preview for Seica Inc. participation at Apex, San Diego, CA, February 4-6 2020, Booth 1922 at the San Diego Convention Center, Harbor Drive.

Industry News | 2020-01-15 14:56:32.0

Standard One of a Kind: innovation is truly standard for Seica Inc., and the resulting unique and unusual solutions will be on full display at Apex 2020.

SEICA SpA

GSM1 zero - timeout waiting for spindle up error

Electronics Forum | Fri Sep 14 19:55:06 EDT 2018 | amartineck

I have a GSM1 that when try to zero it, it stops with the "Timeout waiting for spindle up" message. To get thsi up and running, I have set all my machine settings to default and had to reselect the head from a C4 1 head to the flex head. I initially

Timeout waiting for nozzle changer vacuum buildup.

Electronics Forum | Fri Sep 08 22:37:30 EDT 2017 | ttheis

If you have two changers and only one head, make sure there is only one open port (one changer should be filled up and the other should have one open hole.) The head should be full of nozzles as well. As you mentioned go into the diagnostics and act

Timeout waiting for nozzle changer vacuum buildup.

Electronics Forum | Fri Sep 01 09:54:02 EDT 2017 | gsmx4321

I get a Timeout waiting for nozzle changer vacuum buildup failure every time I go to run my 1998 GSMx machine. The problems seems to be that once in a while (it seems to be random) the spindle does not line up exactly in the center of the nozzle cha

Timeout waiting for nozzle changer vacuum buildup.

Electronics Forum | Tue Sep 05 11:09:09 EDT 2017 | emeto

The message might still be correct. Change the pneumatic cylinder on the nozzle changer - I have seen these to go bad.

Timeout waiting for nozzle changer vacuum buildup.

Electronics Forum | Tue Sep 05 10:14:41 EDT 2017 | swag

Try a fid teach on your changers. I don't recall how to do it but you'll find it pretty easy if you surf around. Also, the seals on the nozzles must be good and soft. If you can still get them new, I'd replace. Same goes for seals in changers. C

Timeout waiting for nozzle changer vacuum buildup.

Electronics Forum | Tue Sep 05 14:40:08 EDT 2017 | rgduval

We emailed off forum about this...and I'm wondering how things are progressing. As I noted in email, our issue was the nozzle change was resulting in too many nozzles being out of the same vacuum channel on the tool box. I can't remember how it was

Stencil Printing for 0201 Applications

Electronics Forum | Mon Sep 17 15:27:51 EDT 2001 | jschake

Challenges: The basic defects that impact assembly yield are bridging, satellite solder balls, and opens (i.e. tombstones / draw bridges). There are many variables with the stencil printing process that can impact these; several of them are listed

Re: IP1 for Placement of BGA's?

Electronics Forum | Sun May 30 15:11:10 EDT 1999 | M Cox

| | | | | Is it possible to place parts that do not have leadframes exposed when looking from the top side of the part such as BGA's using a Fuji IP1 with a SMD1 vision (Binary) system. I realize that the IP1 does not have front lighting but accordin

Re: IP1 for Placement of BGA's?

Electronics Forum | Sun May 30 18:34:04 EDT 1999 | Earl Moon

| | | | | | Is it possible to place parts that do not have leadframes exposed when looking from the top side of the part such as BGA's using a Fuji IP1 with a SMD1 vision (Binary) system. I realize that the IP1 does not have front lighting but accord


timeout waiting for vacuum build up searches for Companies, Equipment, Machines, Suppliers & Information

Best SMT Reflow Oven

World's Best Reflow Oven Customizable for Unique Applications
Baja Bid Auction JUL 9-10, 2024

High Precision Fluid Dispensers
High Throughput Reflow Oven

Training online, at your facility, or at one of our worldwide training centers"
Fully Automatic BGA Rework Station

"回流焊炉"