Electronics Forum | Mon Apr 18 08:34:42 EDT 2011 | patrickbruneel
The link to his obituary. http://craigflagler.typepad.com/online_obituaries/2011/04/werner-engelmaier.html
Electronics Forum | Sun Apr 17 15:29:24 EDT 2011 | davef
Wow, that is sad. He was always doing neat stuff like that ... scuba diving in Aqaba, Jordan or skiing in Zermatt, Switzerland. He was generous with his great knowledge of soldering. I'll miss him. Steve, thanks for posting this.
Industry News | 2009-04-15 23:12:38.0
BANNOCKBURN, Ill., USA, April 1, 2009 � IPC � IPC � Association Connecting Electronics Industries� presented Special Recognition, Distinguished Committee Leadership and Distinguished Committee Service awards at IPC APEX EXPO 2009, held March 31�April 2 in Las Vegas.
Industry News | 2011-04-20 21:26:17.0
IPC — Association Connecting Electronics Industries® presented Special Recognition, Distinguished Committee Leadership and Committee Service awards and a Presidents Award at IPC APEX EXPO™, held April 10–14, in Las Vegas.
Technical Library | 2007-08-02 13:24:23.0
This paper presents the results of a joint - three way study between Amkor Technology, Panasonic Factory Solutions and Spansion in the area of package on package (PoP) board level reliability (BLR) (...) The scope of this paper is to cover the already popular 14 x 14mm PoP package size that provides a 152 pin stacked interface which supports a high level of flexibility in the memory architecture for multimedia requirements.
Matrix Maintenance in PXI with BIRST Werner Engelmaier: "Mr Reliability" passes. Matrix Maintenance in PXI with BIRST Switching systems, and in particular matrices are a key part of many tests systems. They allow a single core set of test
ASYMTEK Products | Nordson Electronics Solutions | https://www.nordson.com/en/our-company/news-room/feature-content-roll-up-page/maastricht-distribution-center-boosts-efficiency-with-new-carousel
. "It was unreliable, and we can't afford for the carousel to not work." Werner partnered with Will Jacobs, Warehouse Supervisor; and Pascal van Leeuwen, Warehouse Employee to devise a plan for a new system, including updated hardware and software