Optima™ II Laser AOI provides Laser Z-axis measurement, designed for the inspection of Grid LED, capable to measuring the height with 3D. We offer you three types of models, High speed Inspection, High Accuracy, and Extra High Accuracy. SMEMA 1.2 com
New Equipment | Board Handling - Conveyors
PROMATION offers two different solutions for loading a wave solder machine. The EIC-710 is a basic angled transfer conveyor that generally has the line operator hand place the PCB or pallet onto the edge rails for transfer into the wave. The ETF-
New Equipment | Board Handling - Storage
Automatic Label Generation And Placement System For In-line PCB Production. PROMATION'S ELC-1100P automatic label placer is a versatile next generation system that allows for high resolution labels to be generated and placed onto circuit boards with
Multiple Groups Of Blades PCB Separator is equipped with standard 20 groups of blades which can separate 10 LED bars at same time , compared with traditional single blade cutter , it greatly improve the production efficiency and reduce labour costs.
Offering HCT-1200-SV full automatic LED Pick and Place Machine / SMD LED Placement Machine. * Placement rate (optimized) 40,000CPH * 8 placement heads * Maximum PCB size 1200×380mm * Placement accuracy: ±0.05mm * Component range: 0603~5
AI universal parts 30997607 46737003 SCRAP HOUSING ASSY, OFFSET 46737103 SCRAP HOUSING ASSY, "T" STYLE 46750601 COVER, CLINCH OFF 46750901 COVER, CLINCH VSL 46757801 PICKER AXIS MTR ASSY 46757901 X AXIS MTR ASSY 46758001 Y AXIS MTR ASSY 46758101 ELE
panasonic AI parts N210044355AA 46737003 SCRAP HOUSING ASSY, OFFSET 46737103 SCRAP HOUSING ASSY, "T" STYLE 46750601 COVER, CLINCH OFF 46750901 COVER, CLINCH VSL 46757801 PICKER AXIS MTR ASSY 46757901 X AXIS MTR ASSY 46758001 Y AXIS MTR ASSY 467581
The long-term inspection solution for wave, reflow, pre-reflow and selective soldering. In the manufacturing of electronic assemblies, optimization of the production processes is a major factor in the success of producing to the high demands of qual
1 |