Electronics Forum: 2.cp6 (Page 1 of 1)

SMT tact time

Electronics Forum | Wed Sep 08 20:48:36 EDT 2004 | peter016

Hi Rob, I guess the ratio between chipmounter and GSM is very much depending on the chip to ICs ratio. This is product dependent. We use 2 HS50 to 2 GSMII, 5 S20 to 2 GSMII, 3 Sanyos to 2 GSMII, and 2 CP6 to 2 GSMII. Are these ideal ratios ? Lean Ma

QP-132E // FCM 2

Electronics Forum | Sat Apr 20 22:50:36 EDT 2002 | lysik

I am sure the QP-132 is a more stable platform. It is a Fuki after all. My big question is why not X2 CP-6 machines. I mean you can tell by resale value of the FCM Vs the QP-132 that the QP-132 is a rock solid machine but, for such cheap money two CP

How to calculate the line capacity

Electronics Forum | Mon Feb 06 04:18:03 EST 2006 | Rob

Get a stopwatch & time your functions to see which is the slowest. I am guessing it's going to be the oven, printer (if using paste inspection) or the AOI. If you are talking the average or optimum speed in CPH, that would depend on the type of b

Recomendations? Fuji CP7 or Univ HSP4797?

Electronics Forum | Wed May 26 00:41:31 EDT 2004 | fastek

I don't think you can go wrong with either choice. Couple of other things to consider: 1) Are both machines similar in price? 2) CP-6 feeders will work on a CP-7 although the larger pans need to be changed. Used CP-6 feeders go for about $175 on av

SMT EQUIPMENT FOR LOW VOLUME HIGH MIX

Electronics Forum | Mon Apr 28 12:29:23 EDT 2003 | hruiz

Hi Jax, I�ve took times, and average, we last from 25 to 40 minutes to load a CP6 depending on how big is the load, but quality guys last other 25 min. per equipment to audit, we usually have 2 CP6 and 1 GSM or 1 CP6 and 2 GSM, at any case, we need t

SMT tact time

Electronics Forum | Thu Sep 09 04:00:22 EDT 2004 | rlackey

Hi Peter, You certainly have a selection of kit. We use 2 CP6's & 2 GSMs per line, and that balances pretty well (sometimes one of the fuji's is idle though - but we can live with that). When we had S20's we found 2 of them roughly kept up with a

0201

Electronics Forum | Fri Feb 22 10:46:04 EST 2008 | mulder0990

Yes, we have. We do have one machine that can place the 0201 parts. I have bought some 0.4mm tape leaf covers and replaced the 0.7mm covers on some CP6 0802 feeders. I calibrate the feeders as tight as I can and make sure the feeders that we use a

  1  

2.cp6 searches for Companies, Equipment, Machines, Suppliers & Information

Hot selling SMT spare parts and professional SMT machine solutions

Reflow Soldering 101 Training Course
One stop service for all SMT and PCB needs

Software programs for SMT placement and AOI Inspection machines from CAD or Gerber.
convection smt reflow ovens

High Resolution Fast Speed Industrial Cameras.
Pillarhouse USA for handload Selective Soldering Needs

Easily dispense fine pitch components with ±25µm positioning accuracy.
Electronic Solutions R3

Internet marketing services for manufacturing companies