Electronics Forum | Wed Mar 30 10:08:15 EST 2005 | steve
Granite is a porous material and if anyone decided to clean this material you probably have an insulative barrier thus you would never have static dissipation. Spend $45.00 and put a mat over the granite or spend $80.00 and get an esd laminate materi
Electronics Forum | Thu Jun 02 19:42:24 EDT 2005 | garymizuno
I'm still buying my solder printer cleaning rolls from my manufacturer. Does anyone know of any after market brand that is as good in quality and atleast half the price. I am paying $80.00 a roll. Gary
Electronics Forum | Fri Jun 02 16:30:42 EDT 2000 | Michael Parker
I found a reference to Cost of Conversion earlier this year. Basically, the average cost to convert a single component from raw materials to assembled goods is $.08, just after pick and place. After placement and before reflow, repair (solder paste r
Electronics Forum | Thu Mar 09 00:45:57 EST 2006 | kent_peterson
Fastek will get it done with 2 machine and 2 shifts. 2 shifts would need to place 50,000cph. One CP643 with both device tables set could get it done. Having it panelized in 50's, you would need to print 50 panels a hour so get a auto cleaner on the p
Electronics Forum | Wed Oct 17 09:34:51 EDT 2007 | actech
Jon, I looked it up woth NSK thats the name on it. A rep had to talk to the factory and found out it's a discontinued part. simular bearing sell between $ 80.00 and $120.00 some sell as sets two bearing and one slide , some sell just bearing, NSK
Electronics Forum | Tue Dec 29 23:37:09 EST 1998 | Mike Konrad
James, Most rental DI systems are as follows: Option #1: 2 mixed bed resin tanks: In this case, a 1 M-Ohm light should be installed on the output of tank #1, before tank #2. When the 1 M-Ohm light indicates that the output of the #1 tank is below
Electronics Forum | Thu Oct 12 22:16:59 EDT 2000 | Dreamsniper
Hi Guys, I'd like to share this to all of you...you can start playing with the rests...Stated prices, if not indicated, are in Aussie $ or Singapore $. Stencil Printing Adhesive Pros a) Less Capital Equipment Cost (Short Term). In reality it is f
1 |