Electronics Forum: box-build (Page 1 of 4)

Effective Part Numbering System Used For Contract MFG. Co

Electronics Forum | Thu Jul 03 09:27:07 EDT 2008 | grics

I would have to agree with using your own part numbering scheme. Suppose you have a couple of customers who use the same size/material M3 X 6MM screw... However, one of your customers does not approve of a vendor that your other customer does. B

Board baking after washing machine

Electronics Forum | Thu Nov 01 17:36:20 EST 2001 | davef

We don�t bake between routine washing between soldering cycles. We bake when we immediately go to test or box-build. Certainly, it all depends on your process, materials, and boards. So, how did you determine that you needed to spend the money? I

Contract manufactuer in China

Electronics Forum | Sat Apr 26 04:17:43 EDT 2003 | PANKAJ SHARMA

Please be advised that India has very competitive SMT contract manufacturers. We are leading PCB assy contract manufacturer in India having two DEK-FUJI lines and are catering to Telecom,IT Hardware and Instrumentation industry for their PCB assy an

Effective Part Numbering System Used For Contract MFG. Co

Electronics Forum | Wed Jul 02 12:51:24 EDT 2008 | arminski

Say I have more than 10 customers all Box Build products, what is the effective and efficient component part numberings system for my company : Make Own Part Numbers? Adopt Customer Part Numbers? Own Part Number and Customer PN Mixed or Combined?

Problem with rigid-flex PCB pressing (PVC and PET damage)

Electronics Forum | Thu Nov 06 12:25:42 EST 2014 | arifa_anees

Rush PCB Provide their customers with printed circuit board assemblies, electronic assemblies, medical assemblies, and box-builds that are built to customer specifications at the most competitive prices while maintaining the highest quality of workma

BGA In Circuit Testing

Electronics Forum | Wed Mar 06 21:21:48 EST 2002 | davef

DeltaScan, a Teradyne fixture-less tester coarsely comparable to HP TestJet, eh? Er, wazzat what Milo [contact programmer at CTU on 24] used to hack into the key card that Richard Walsh [CTU honcho shot dead at Dupont plaza] gave to Jack [this is go

Pneumatic vs Electrical screw drive

Electronics Forum | Fri Oct 18 11:32:15 EDT 2002 | yngwie

Hi Experts, Here in Box builds area, there was an argument on frequency of verifying torque reading. Shiftly changed to daily and now we are changing it to weekly. The reason for relaxing this frequency is b'cos the data we collected shown that the

Pneumatic vs Electrical screw drive

Electronics Forum | Fri Oct 18 11:33:25 EDT 2002 | yngwie

Hi Experts, Here in Box builds area, there was an argument on frequency of verifying torque reading. Shiftly changed to daily and now we are changing it to weekly. The reason for relaxing this frequency is b'cos the data we collected shown that the

BGA open joint

Electronics Forum | Thu Aug 05 21:47:35 EDT 2004 | KEN

Agreed. Joint failure can happen when un-bagging or durig box-build (at customer site). Careful handling should be used. In one case I had boards returned to me for evaluation and failure analysis. Too bad our site never built the boards!!! (jacka

PCBA flatness

Electronics Forum | Mon Mar 13 04:37:13 EST 2006 | Daniel

Hi Experts, We have requirement from our customer to control the PCBA flatness at 10 mils diagonally. Weird but this is the requirement due to the need for some through hole pins (spreaded acroos the board must touch the copper sheet while they are

  1 2 3 4 Next

box-build searches for Companies, Equipment, Machines, Suppliers & Information

Circuit Board, PCB Assembly & electronics manufacturing service provider

Reflow Soldering 101 Training Course
Void Free Reflow Soldering

Software programs for SMT placement and AOI Inspection machines from CAD or Gerber.
High Throughput Reflow Oven

Training online, at your facility, or at one of our worldwide training centers"