Electronics Forum: components placement per hour[0] (Page 1 of 19)

Re: Cost per placement measure

Electronics Forum | Wed Oct 13 03:38:21 EDT 1999 | Paul Gerits

Hi Morris, I work as a technical consultant, application specialist for Philips EMT (SMT machine suplier). For cost per placement complex calculation can be made. To make a easy one just to hav an idea you can use following. Information needed: Pr

Re: Cost per placement measure

Electronics Forum | Tue Oct 05 01:22:46 EDT 1999 | Karlin

| I am working on trying to define a cost per placement measure in our SMT assembly operations. | | Does anyone know where I might find a published industry average that we may compare to? | | I�ve heard it stated that an industry average is less t

placements per hour

Electronics Forum | Tue Feb 21 13:21:42 EST 2006 | Frank

Are those stick feeders made from Component Express? They look and operate very similar to their feeders.

placements per hour

Electronics Forum | Fri Feb 17 14:55:36 EST 2006 | Mity-C

Jobbie, We are also not using the Mydata forks for the vibe feeders. We take a tube for the vibe component and cut a pick pocket. We use the back of the forks as stops. This has eliminated many of the pick problems from the vibes. Good Luck Chris

Cost per component

Electronics Forum | Thu Apr 28 02:03:10 EDT 2005 | Yngwie

Just to check and see if I'm using the right formula in my "cost per component placement" calculation is correct or not. Any input would be much appreciated. Total cost of the machine : A Depreciates over 5 years Actual/best UPH obtained 11000 cph

placements per hour

Electronics Forum | Thu Feb 16 06:37:07 EST 2006 | Mity-C

Good Morning jobbie, We have several Mydata lines. We are building low volume high mix as well. Our CPH had been identified as approximately 6000-8000 CPH depending on the application of course. We do have a separate setup area however that stages a

placements per hour

Electronics Forum | Tue Feb 28 12:20:31 EST 2006 | gregp

As far as I recall the Component Express is a copy of a prototype we showed around trade shows about 5 or 6 years ago. In the case of the Component Exress feeder basically you stick an air tube in the back of a stick. It is in no way comparable to

placements per hour

Electronics Forum | Fri Feb 17 17:23:11 EST 2006 | grantp

Hi, One think we always hated when running MYDATA was the vib feeder, and we had no end of problems. The supplier told us most people angled the component tubes up, however then the vib settings change between when the tubes full, and mostly empty.

Placement Cost per component categories

Electronics Forum | Thu Aug 01 07:51:04 EDT 2002 | GregH

Are all components calculated at the same cost when calculating cost per placement? Are they categorised according to their sizes / dimensions as per machine placement speed or are they also categorised as per component technology? Can anyone give m

Placement Cost per component categories

Electronics Forum | Thu Aug 01 07:52:37 EDT 2002 | GregH

Are all components calculated at the same cost when calculating cost per placement? Are they categorised according to their sizes / dimensions as per machine placement speed or are they also categorised as per component technology? Can anyone give me

  1 2 3 4 5 6 7 8 9 10 Next

components placement per hour[0] searches for Companies, Equipment, Machines, Suppliers & Information

Void Free Reflow Soldering

Wave Soldering 101 Training Course
pressure curing ovens

Best Reflow Oven
SMT feeders

Training online, at your facility, or at one of our worldwide training centers"
Win Source Online Electronic parts

High Resolution Fast Speed Industrial Cameras.
PCB Handling with CE

Have you found a solution to REDUCE DISPENSE REWORK? Your answer is here.
Electronic Solutions R3

Thermal Transfer Materials.