Electronics Forum | Thu Feb 10 07:13:06 EST 2000 | JAX
Doug, If you are looking to reduce the size of your database you have many options. You can use the Jedec outline or Jedec name to standardize your component library. Otherwise you can set one up specific to the dimensional info you measure. If you
Electronics Forum | Sat Feb 12 15:54:11 EST 2000 | Francois Racine
> customer number and package number =>> EX:1206T.5 The part number is used for two reason. (1) Your operator know exactly what component is in this feeder and the value of that component. (2) On my two PNP machines, I can use an IPC module which
Electronics Forum | Fri Feb 11 12:21:44 EST 2000 | Finepitch Services
Doug, What I've done in past was calling them as 1206T.5, 1206T1.0, SOIC16, RESNET16, SOIC16T5.0, ALCAP4, ALCAP5 etc. T means thickness but for the ALCAP case 4 means 4mm diameter. If you have the time and patience, having a board and attaching a s
Electronics Forum | Tue Jul 15 12:55:41 EDT 2003 | sam
We are contract manufacturer for SMT and complete products. There were cases that we charge our customer for the set-up costs, mainly for some trial and evaluation work on our SMT line, especially when mass production order is not confirmed yet. F
Electronics Forum | Fri May 30 17:55:34 EDT 2003 | davef
Two words: competitive bidding
Electronics Forum | Mon Jul 14 12:12:51 EDT 2003 | MA/NY DDave
Hi, Ever onward to Brainstorming. If you really wanted to reduce set up charges you would have to guarantee a volume and price with early termination charges. This would require a lot of trust on their part and some investigation of your bill paym
Electronics Forum | Fri May 30 17:20:53 EDT 2003 | jonfox
Is this setup charge the cost of purchasing the required materials? I left that out of my previous post. As far as manufacturing cost, usually they add up the cost of machine time (leased or owned), operator time (wage based), and the size of the o
Electronics Forum | Fri May 30 15:51:52 EDT 2003 | caldon
I am really reaching for the crack pipe now!! We recv'd a quote from a CM with a set-up charge and a Manufacturing charge. Is there a generic rule of thumb or ratio between Set-up and Manufacturing? One would think the manufacturing would be cheaper
Electronics Forum | Tue Aug 23 12:58:16 EDT 2011 | emeto
Hello everyone, we are contract manufacturer and I am wondering if we can save some time from inspection and verification. We will usually inspect the bare boards, then, verify program to BOM, then feeders to BOM and Feeders to program,then paste ins
Electronics Forum | Fri May 30 17:05:57 EDT 2003 | jonfox
Back from my days at a CM, the setup fee was only used for first time customers. Basically this was to ensure that if the relationship was to be permanent, all data formats, documentation, and special issues were taken care of. This requires extra
Manufacturer of PCB depaneling and PCB soldering machines since 2005, products include CE approval V-groove PCB depanelizer, PCB router, PCB punching machine, laser depaneling, hot bar soldering machines and soldering robots.
Liwu Industrial Park, Yuanzhou Town, Boluo
Huizhou, 30 China
Phone: +86-138-29839112