Electronics Forum | Tue Jul 05 05:23:34 EDT 2005 | kentes
We have one set MPM AP25. Its prestop position is not stable,but stop position is stable. It often occur "time out" alarm when load PCB.Which one can help us.
Electronics Forum | Wed Jul 06 10:22:04 EDT 2005 | PWH
At times we have had this problem with our AP25 due to one of the conveyor belts slipping. Load a PCB and check to see that both conveyor belts are running at the same speed. If not, tighten the one that is dragging. Hope this helps.
Electronics Forum | Mon Feb 12 09:44:47 EST 2007 | SWAG
Enhanced board set-up, set conveyor width, load board, (your fiducials must be accurate!), use two fiducials to set reference point, click on placement(s), move crosshair to centerpoint, use two point teach to teach one point in the center or use cor
Electronics Forum | Wed Jan 27 08:39:07 EST 2016 | thefinder
Hi to all. i resolved my problem. I just select "LOAD" option the the program run.
Electronics Forum | Sat Aug 19 08:14:25 EDT 2006 | johnw
I am experiencing the same problem just now on one of my FCP643 machine only when I change program and the machine moves to load position to clamp the board, as soon as I get to the bottom of this I will let you know.I suspect its the Z-AXIS loader c
Electronics Forum | Sat Aug 19 08:01:39 EDT 2006 | johnw
I am experiencing the same problem just now on one of my FCP643 machine only when I change program and the machine moves to load position to clamp the board, as soon as I get to the bottom of this I will let you know.I suspect its the Z-AXIS loader c
Electronics Forum | Thu Dec 27 17:13:02 EST 2007 | mee13
The CP643 has a 0201 camera and a dual board loading system
Electronics Forum | Mon May 23 22:30:36 EDT 2005 | Frank
Hi all, I am trying to solve a problem with a CP643E any help on it please,It stop during production on an error for (Outside Target Position). Cheers Frank
Electronics Forum | Tue Jan 01 22:50:53 EST 2008 | fastek
To get beyond the 36,000 cph threshhold the turret manufacturers had to focus on ways to get the boards in and out of the machine faster. This also included loading more boards inside the worknest. The end result in Fuji's case (CP-643), was a table
Electronics Forum | Tue Oct 02 10:26:17 EDT 2012 | jimmyboz
If I had a choice I would choose a CP642 90% of the time. The loading system on the 643 can load 2 PCBs at the same time but is complicated. If 2 seconds on PCB load time is critical on your production choose the 643, if not, choose the 642.