Inspecting a new stencil

Electronics Forum | Fri Feb 15 08:44:42 EST 2008 | mmjm_1099

FYI, Here are the steps in which we take to get approval. The stencil gerber layer needs final approval through our Engineering dept. What they do is send in a gerber layer from the stencil house and lays it over the current solder paste layer and ve

Mydata package libraries

Electronics Forum | Tue Oct 24 13:07:54 EDT 2006 | CL

Hello Billy, We have 6 machines tied to a server. I can see where this would be a problem. Basically, the answer is you would need a package for every significantly different package that you are placing. I don't think you can just say 3 0805 packag

This is a new one

Electronics Forum | Thu May 11 12:44:04 EDT 2006 | slthomas

One of our customers' products has a couple of adjacent 0603 packages (one resistor, one cap) that are .010" apart. They are side by side, not end to end. The adjacent pads between the two parts are electrically connected so bridging isn't an issu

ScanPlace or any scanner cad package

Electronics Forum | Thu Jan 17 18:29:01 EST 2002 | Bill Loving

Dear Jason, Thank you for posting your request on SMTNET. Please note that ScanCAD International provides an upgrade path for all installed customers, regardless of the age of their system. Currently, hundreds of systems are installed in 37 countr

ScanPlace or any scanner cad package

Electronics Forum | Thu Jan 17 18:33:24 EST 2002 | Bill Loving

Dear Jason, Thank you for posting your request on SMTNET. Please note that ScanCAD International provides an upgrade path for all installed customers, regardless of the age of their system. Currently, hundreds of systems are installed in 37 countr

ScanPlace or any scanner cad package

Electronics Forum | Thu Jan 17 18:09:09 EST 2002 | Bill Loving

Dear Dave F. Please note that ScanCAD International Inc. moved to a new building in 1995 and the current address and contact information is: www.scancad.com ScanCAD International, Inc. P.O. Box 598 Morrison, CO 80465-0598 Phone: 303-697-8888, Fa

Dye And Pry on WLP package BGAs

Electronics Forum | Tue Apr 07 14:56:30 EDT 2015 | davef

Try a beer can opener, like thi: http://www.foodservicewarehouse.com/american-metalcraft/cab45/p386302.aspx?utm_medium=cpc&utm_term=American-Metalcraft-CAB45&utm_campaign=Bottle-Openers&utm_source=googlepla&source=googleps&utm_content=googlepla|mkwid

Re: Component solderability problems TO263 package

Electronics Forum | Thu Aug 10 12:14:12 EDT 2000 | Charles

It looks like a giant dpak device but with 5 leads. The problem is that on approx 3% of our boards one more pins are open circuit. It appears that the pins are not in contact with the pads. Board is HASL finish IR oven Paste Koki 953i. If you have a

Adding new line

Electronics Forum | Sat Jun 09 10:38:39 EDT 2012 | anton99

Thank you both ( Gnus and Phil) for the replies. I will try to answer both with a new post. I like the idea of the stock room splitting the reels but our reels are released to the floor where the Magload ( Kit building) area stores them and builds t

Re: I looking for a beta site for a new drying process

Electronics Forum | Thu Aug 19 14:06:07 EDT 1999 | Stu Leech

| | | | We have developed a new process for removing moisture from surface mount devices. We have one site where PCB laminate drying has been reduced to 1.5 hours. A standard oven took 4 hours to do the job. I am looking for a firm who does large sca