Electronics Forum | Thu Nov 30 05:01:52 EST 2006 | aj
I dont claim to be a guru but I would say that the only cycle time you can control or be responsible for is your machine cycle time. Operator cycle time will vary and you cant control that.
Electronics Forum | Sun Apr 07 18:21:08 EDT 2002 | murt
Hi I am a collage student and I was wondering if anyone could explain to me how you would estimate the trough-put, product and cycle time for a double-sided mixed technology pcb assembly. I would be grateful for any information Thanks Martin.
Electronics Forum | Fri Feb 07 11:03:35 EST 2003 | amair
Hi, Anyone can tell how accurate the gsm performance simulator if compare to actual production cycle time?Sometimes I found the cycle time for production run is much better than the simulator.
Electronics Forum | Wed May 12 11:07:10 EDT 2004 | msjohnston1
The GSI may pass gauge after installing the 2x scanner, but the cycle time doubles. Is the cycle time hit worth the accuracy?
Electronics Forum | Wed Nov 16 08:53:26 EST 2005 | nkbkiran
Once the gerber files and BOM list are generated by CAD packages for download on to SMT production line....How is the cycle time of that PCB operation determined? Is their information with in Gerber files by which you can estimate, before actual pr
Electronics Forum | Thu Nov 30 09:28:23 EST 2006 | SWAG
Cycle time is one thing, "operating factor" is another. Set-up and tear-down should be seperate from cycle time as well.
Electronics Forum | Tue Aug 19 03:35:26 EDT 2008 | dlocampo
But the problem with flying probe is the cycle time. I'm not sure if there is a flying probe out in the market today that can match the cycle time of the conventional bed-of-nails ICT.
Electronics Forum | Sun Nov 08 12:50:17 EST 2009 | martinphill
Pls explain which one need to consider for Product cycle time. 1) Machine Rated CPH or 2) Programming Cycle time.
Electronics Forum | Mon Oct 21 03:27:15 EDT 2019 | btkhoo68
we would like to monitor ASM siplace feeder, cycle time, nozzle.event using SCADA. Anybody able to provide memory address allocation for above data value to read by SCADA
Electronics Forum | Mon Mar 30 01:53:15 EDT 2020 | franknguyen
Hi, I have 2k test points need to test by Flying Probe. How can I assume the test cycle time for this? (I use Takaya Flying Probe)