Electronics Forum: expected (Page 1 of 125)

Calcualtion of expected yeilds

Electronics Forum | Tue Jul 11 12:57:24 EDT 2000 | JohnW

Folk's.. me again... You know how it is, you build the boards, you look at the quality and say gee it should be better. Your boss say's it should be better...the quality engieer say's...man that's crap...but no one can tell you what it should be. O

Selective Soldering expected PPM levels

Electronics Forum | Wed Nov 24 08:44:00 EST 1999 | Chris Jackson

I have a PCB that I am looking to do selective soldering. I am looking at several systems (IE Seho, Pillarhouse, Premier Tool Works, wave pallets). The board is mixed SMT/PTH, but only has SMT on topside. It has 4 PTH(2 leads ea)components (.030 lea

Re: Calcualtion of expected yeilds

Electronics Forum | Wed Jul 12 05:04:01 EDT 2000 | JohnW

Hi Guy's.... Was thinkng about i more this moning..in the shower actually...sometimes think I do my best work there!. So far I'm looking at stuff like integrating the DFM study to show thing's that are going to present production / process issues e

error message :pcb expected at exit

Electronics Forum | Fri Sep 14 04:11:16 EDT 2012 | mili

Hello!I have a delta wave with these problems:offtime of lambda wave tracking is too long and when modify offtime setting to a negative value for a fast stop on tracking position of lambda wave, the wave pass on stand-by with a delay of half of leght

NEPCON - not what I expected

Electronics Forum | Thu Jun 13 15:43:19 EDT 2002 | mjabure

The major draw at NEPCON was the the machine manufacturers. With most of the big players going to the APEX shows, NEPCON attendance has seemed to slow down quite a bit. Although APEX wasn't very busy either. With the industry in it's current state no

NEPCON - not what I expected

Electronics Forum | Thu Jun 13 12:44:09 EDT 2002 | steve_5588

Well the show was something else. I think they should seriously consider renaming it CON. As an exhibitor, it has been a while since attendance was this poor. Sure we got some "quality" leads, but from my perspective the show was dead. The visito

NEPCON - not what I expected

Electronics Forum | Fri Jun 14 00:42:23 EDT 2002 | kenbliss

Thanks for the report, I am glad I did not spend the money to do the show. Although I am not happy with the way NEPCON shows have ran for the last 4 years anyway. APEX is and was a good show but at the mercy of this very soft market. APEX is by fa

vitronics delta wave malfunction errors :pcb expected at exit

Electronics Forum | Fri Oct 05 15:37:07 EDT 2012 | mili

another delta wave have the same fault, same symptoms!!!

vitronics delta wave malfunction errors :pcb expected at exit

Electronics Forum | Fri Sep 14 03:43:16 EDT 2012 | mili

Hello!I have a delta wave with these problems:offtime of lambda wave tracking is too long and when modify offtime setting to a negative value for a fast stop on tracking position of lambda wave, the wave pass on stand-by with a delay of half of leg

vitronics delta wave malfunction errors :pcb expected at exit

Electronics Forum | Fri Sep 14 08:53:43 EDT 2012 | mbnetto

Hi, Recently we acquired a Delta 3 and I noticed everytime we change any value regarding to the tracking system, as chip or main wave - offtime/ontime- with boards loaded on it, the tracking system doesnt work well. sometimes it turns off the wave o

  1 2 3 4 5 6 7 8 9 10 Next

expected searches for Companies, Equipment, Machines, Suppliers & Information