Electronics Forum | Tue Feb 15 10:21:19 EST 2005 | gregp
Any tape--any pitch. On our C5 platform every part number (in your database) has a package type assigned to it. The package type contains the information about the pitch and component orientation. When you load the feeder you scan the part number-
Electronics Forum | Tue May 21 12:58:15 EDT 2013 | highmillr
We have 2-Samsung 431's followed by a 421 on our line..We run different revision boards with similar parts. Is there a way I can run one revision feeder set up.Then switch over to the next job without having to switch feeders around for the new progr
Electronics Forum | Wed Feb 07 13:41:20 EST 2007 | coop
I contacted philips/assembleon and they said it was 1,200 new I think we might end up going this route, I've stacked up old trays before, would rather not restrict the amount of feeders I can load, but you're right it will get yah by in a pinch. than
Electronics Forum | Tue Mar 30 10:57:54 EST 1999 | Steve Gregory
Hello, I'm a student assistant in a research project that deals with the simulation of PCB assembly systems. At the moment I collect information about SMDs. My problem is how to assign the correct feeder width to various devices in a simulation. Is
Electronics Forum | Tue Oct 09 12:04:37 EDT 2001 | Mike
Has anyone looked at setup reduction for machine feeders. We have made some gains through changing the flow of work but as lot sizes decrease the number of parts required remains the same. We remove all reels from the feeders after a job is complet
Electronics Forum | Tue Oct 09 16:25:26 EDT 2001 | meowen
Unfortunately 95% of our runs require both sides of our Universal HSP's. We also have carts that hold one carriage worth of feeders on each side. Parts that carry over from one product to the next are flagged and relocated in the machine per the ne
Electronics Forum | Tue Oct 09 14:59:52 EDT 2001 | slthomas
That's what we do with our MSHII's...setup one carriage offline while the other one runs. We also have setup carts to load the feeders ahead of time and haul them out to the lines. Of course, when we exceed the carriage capacity of 75 slots for an
Electronics Forum | Fri Nov 09 14:42:08 EST 2001 | vickt
Great advice!........Single tier feeder set-up carts are also available through Universal instruments directly for this exact purpose. Most people who really care about this changeover time have "pit-crews" that work in the component storage areas, o
Electronics Forum | Sun Dec 25 17:35:06 EST 2005 | Mika
No camera re-calibration is required. Just don't load the deafult calibration parameters. /
Electronics Forum | Fri Dec 09 17:57:16 EST 2005 | mika
cameras > P2P (Part to Pad looking camera or upper looking camera) > front or rear >> select the corresponding camera that You have installed. After that: just save and follow the instructions on the screeen. By the way, an important thing is: You M