Electronics Forum | Mon Apr 18 10:01:33 EDT 2005 | global
The CCA drawing actually does belong to our customer as it is a DOD contract. We were the last ones to ever build the cards but since so much time has passed since the last build all of our PWB vendors like us have probably purged their systems of al
Electronics Forum | Tue Apr 26 15:44:05 EDT 2005 | global
Thanks to all that replied but now I have a new problem. I actually did come across the gerber files............but there on reel to reel tapes. Does anyone know of a company that has the ability to read the magnetic reel to reel tapes and dump the f
Electronics Forum | Wed May 18 18:36:22 EDT 2005 | global
Ok here's one for ya. We have a DEK 260 with a Cyberbectic vision system, 1 of about only 50 made as told to me by a DEK service Tech. So if anyone has operated one of the other 49 you may be able to help. The Service techs at DEK are not familiar en
Electronics Forum | Mon Mar 06 13:00:37 EST 2006 | global
We have a Siplace S15 and I would like to know if it is possible to make it skip a part during the placement operation with out aborting the job? In section 5.4.4.4 of the user's manual it describes how to set a track to empty and proceed on with the
Electronics Forum | Tue Apr 11 11:40:41 EDT 2006 | global
We have a Siemens S15 and an F3, which we have only had now for about 4 months. We have an old line of HS180s and an SP120 and have found that the S15 and F3 do not have the option to skip a part if one runs out during placement. We from time to time
Electronics Forum | Fri Jul 30 17:26:27 EDT 2004 | cvega
The website for GPD Global is www.gpd-global.com
Electronics Forum | Wed Jul 13 08:32:52 EDT 2005 | chunks
Global warming? Hmmm, seems to me the Earth has been getting� warmer ever since the Ice Age. Seriously, do you believe lead is a major contributor to global warming or just a severe right wing nut?
Electronics Forum | Thu Oct 19 14:49:35 EDT 2006 | sliebl
We teach all of the fids. Globals and Locals. This is because we use a magnetic table, not a pass through conveyor. Without showing the machine the global fids, it has no idea where we've mounted the board.
Electronics Forum | Thu Apr 30 14:05:16 EDT 2020 | davef
You're talking about lead forming equipment. GPD Global [ Mary Kohler, Sales & Marketing mkohler at gpd-global.com ] helps support SMTnet Other suppliers are: Manix, Ebso & Manncorp Regards, David Fish [davef] Technical Editor & Customer Advocate
Electronics Forum | Tue Feb 07 05:41:20 EST 2012 | ngineer
I've got an issue, i can't seem to figure out. I think I need to apply a global offset to all my placements for some reason, and I would like to know why, before I do it. nozzles work, picks seem ok, but the placements are off by about 1/2 the widt
A Manufacturer of High Quality, Precision, Automated Fluid Dispensing and Conformal Coating Systems, SMT Cover Tape Peel Tester and Lead Forming machines for through-hole component preparation.
611 Hollingsworth Street
Grand Junction, CO USA
Phone: (970) 245-0408