Electronics Forum | Mon Feb 19 00:03:57 EST 2001 | edmond
1. The HS50 is running 24hrs/7days a week. 2. The average mounting points are 40,000cph.
Electronics Forum | Sun Feb 18 14:46:11 EST 2001 | CAL
Some key data is needed 1) how often does the HS 50 machines run? 24/7? 2)How many placements are being performed? I know for a fact Siemens Siplace S/F platforms require weekly preventative maintenance. Knowing the sophistication of the HS platform
Electronics Forum | Sat Feb 17 21:46:26 EST 2001 | edmo
I am the new user for siplace HS50 for about 3 months, running 24 hours production. I used to perform PM every 2 weeks. I have just changed all the plungers(Alu) and nozzles(904) and some nozzle sleeves due to components high throw-out. The estimat
Electronics Forum | Sun May 04 20:11:53 EDT 2008 | marcelll
I'm working on a regular base with Advantis. There's nothing special regarding maintenance with the machine itself, only standard greasing & cleaning each 3-4 months. An hour or two maximum. If you have lightning head on it, it's maintenance free. I
Electronics Forum | Mon May 05 15:11:59 EDT 2008 | kpm135
Thank you very much for the input. In your opinion is this enough of a problem to not recommend the flexjet head? Would you choose this machine again given the chance?
Electronics Forum | Wed Oct 29 18:08:35 EDT 2014 | tombstonesmt
Good afternoon. Not sure if this is available at an engineer level. Perhaps and SD card with field service access is necessary. We have two lines with NPM-W's and the most we've been able to do is actuate vacuum on the heads during flow checks.
Electronics Forum | Fri Nov 13 11:41:37 EST 2009 | gregcr
Hi All, I am implementing a proper feeder maintenance program for my HSP chipshooter feeders. I have the calibration jig. I am developing a procedure with the following general steps: 1. Cleaning 2. Visual Inspection / Repair 3. Calibration / Testi
Electronics Forum | Wed Apr 22 21:10:05 EDT 1998 | D.Lange
I need immediate help temporary, permanent,contract or whatever. Have three quad 3c 100's, one with vision, and one 3-head Mamiya MarkII. Seriously need Extended PM's and regular PM if your PM schedule permits. Need permanent operator and or programm
Electronics Forum | Thu Apr 23 08:06:02 EDT 1998 | D.Lange
| I need immediate help temporary, permanent,contract or whatever. Have three quad 3c 100's, one with vision, and one 3-head Mamiya MHP 30B MarkII. Seriously need Extended PM's and regular PM if your PM schedule permits. Need permanent operator and o