Electronics Forum | Fri Nov 20 00:14:23 EST 2015 | ttheis
To clarify- what I have is: 1. Manual stencil print process 2. Dynapace conveyor into GSM 3. Dynapace conveyor out of GSM into oven So what I need is a way to tell the conveyor into the placement machine to "go" when a board is loaded onto it after
Electronics Forum | Sat Nov 22 09:58:29 EST 2008 | realchunks
The only easy solution is not to handle the boards. Purchase true double sided reflow lines. Buy automated magazine loading conveyors. Check machine board supposrts. Are you sure it's from handling? We found it was 50/50 between board handling
Electronics Forum | Wed Mar 21 11:07:17 EDT 2012 | jtownsend
We are running a CV 400 Wave solder. We are having difficulty getting sufficient flux on the boards. It uses a reciprocating spray fluxer that is controlled based on time by a board sensor located on the load side conveyor. The problem is that there
Electronics Forum | Fri Jul 12 12:00:13 EDT 2024 | jdengler
How would you print 2 different products in the same line? This seems to me to be the sticking point on that approach. I don't see enough benefit of dual lane to justify the added expense. Remember you will need to have dual lane conveyors possibl
Electronics Forum | Tue Sep 24 15:32:22 EDT 2019 | kurtiss
During production our MPM Accuflex stopped working. When going into "Play" mode to run production it almost instantly Pauses. When going into vision setup it fails to load the PCB saying "The PCB Did Not Load". Ignoring this error and trying to read
Electronics Forum | Mon Jul 17 16:29:18 EDT 2006 | aj
Rail widths are fine. The board loads from the previous conveyor and hits the down stop and flags the sensor... It will sit there and time out unless I flag the left rail sensor. It will work properly every now and again. All sensors work fine in t
Electronics Forum | Thu Nov 05 10:02:54 EST 2009 | swag
You can buy a couple of conveyors for loading and unloading machine or a real half aced way is to jump SMEMA cable pins with tweezers to get boards in and out. With that method, you could end up with one on the floor at some point with a smashed, de
Electronics Forum | Mon Jan 20 03:13:34 EST 2020 | silverlead
Included screenshots from DEK manual, outlining stencil depth adjustment. Basically, distance from rear of the stencil to the front of the image is value needed to be set on scale when positioning stencil. There is an other way to adjust stencil, by
Electronics Forum | Wed Feb 10 15:55:19 EST 2021 | ttheis
We just use a ramp to a cart and the line operator loads them into trays as they come out. There are buffer conveyors or magazine loaders you could use. Or do a little industrial automation with a plc and proximity sensors; combine a ramp and a belt
Electronics Forum | Sat Sep 28 15:58:38 EDT 2013 | sonavc
Hi. 'm new to this Fuji CP3, I bought this machine in working condition ( I saw it ran, but I forgot to check the board in and out ).... Moved to my location, Problem: When the board is trying to load to the X-Y table, it passed the conveyor B but