Electronics Forum | Tue Feb 04 08:32:49 EST 2003 | roertner
In my experience AOI's are good for checking machine setup I.E. first piece inspection. After that the only things they will typically catch are wrong parts, reversed parts, missing parts, and tombstones. I would however suggest getting an AOI with a
Electronics Forum | Wed Sep 17 10:39:19 EDT 2008 | daxman
Hey Bwelch, We use the Marantz Nspec 22x (similar to the DL-14) table top AOI here and it's great. No need to bolt it down or attach it to a heavy table; the g-forces are extremely minimal and the machine still operates quickly. 1 guy can pick up t
Electronics Forum | Wed May 31 15:50:15 EDT 2006 | tony_d
Hello Barry, I have not had any experience with the Testronics bench top system. I did, however, evaluate MIRTEC, MVP, N-Spec and YESTech. In my opinion, the MVP was simply too complicated and took too long to program for a low volume high mix man
Electronics Forum | Fri Sep 06 14:35:47 EDT 2002 | bobm
I have been in smt for about 4 yrs. I would say you need to evaluate what type of components you are going to place. How many boards your orders will be for. I use Quad pick and place equipment. These are all around good machines for placing everythi
Electronics Forum | Wed Jan 26 07:18:13 EST 2005 | clampron
Good Morning TM, We have a table top AOI (actually several of them) We did a side by side evaluation when we first looked at it. We looked at Qualectron, NSpec and Mirtec (Samsung at the time). Some of the criteria that was important to us: *Librar
Electronics Forum | Sat Nov 04 07:10:48 EST 2006 | tony_d
Hello bpeach, I recently purchased AOI system for our company. We are a low to mid range manufacturer as well. I looked at several different vendors around the price range that you are looking at incuding; Mirtech, Viscom, N-Spec, Omron, VI Tech, Or
Electronics Forum | Fri May 27 08:30:04 EDT 2005 | FFagundes
I think I have everyone beat. I work for a small Contract Manufacturer, and we are trying to grow our business. We generally have two or 3 different jobs running at the same time and up to 10 different jobs running in a day. So we needed to find a
1 |