Electronics Forum | Wed Jul 28 04:53:59 EDT 2010 | grld_fischer
Hey Dave, Thank you so much for the information. One of my friends suggested me that we have free DFM software’s offered by few PCB manufacturers which enables the designers to check their PCB design during the initial design process, preventing des
Electronics Forum | Mon Jul 21 12:13:04 EDT 2008 | shrek
The industry mantra for the past decade or so has been minimizing material costs and inventory turns. Buyers in the EMS are given directives to buy as cheap as possible to meet these directives. Consequently, they cheap out on the most important pa
Electronics Forum | Wed Nov 21 15:02:46 EST 2007 | jlawson
From info I have been told from design standpoint, via in pads helps with managing EMC issues with working design, in particular for high speed digital/dense populated type PCB's. We had a manufacturing customer that had very low yield because of th
Electronics Forum | Tue Oct 05 22:33:24 EDT 2010 | Mag10
Is there anyone performs solderability evaluation on PCB as a part of receiving acceptance criteria. It's costly to perform any form of physical evaluation whether simple as dip and look or wetting force balance. How do you have control in place to a
Electronics Forum | Thu Sep 11 16:06:34 EDT 2014 | gregp
Hello Esteemed Panel, I have a question...what is the most cost effective way to get power to a PCB? By this I mean connecting power and ground without a connector but something more reliable than soldering a wire directly to the PCB. Whatever solut
Electronics Forum | Wed Aug 01 01:54:57 EDT 2001 | djarvis
Bayanbaru, We do ours like this. We don't care per se about machine utilization. The actuaries have figured out that the facility costs $X per minute to run, this includes wages, utilities, consumables, machine payments, depreciation and whatever els
Electronics Forum | Mon Dec 20 08:23:30 EST 2010 | johanhuizing
The buyers in our company like to change the PCB finishing because of reducing costs. The proposed change is going from Ni/Au to HASL lead free, I know that in the beginning of the lead free period there where a lot of problems to use the HASL especi
Electronics Forum | Tue Feb 21 03:52:33 EST 2017 | pcbcart
Hi rezaee, Spoiltforchoice answered your questions based on the equipment & investment required during the PCB manufacturing process. Well, running a PCB Factory also involves equipment maintain fee, material fee, production cost (including quality c
Electronics Forum | Fri Aug 27 00:26:14 EDT 2004 | charly
hi, encounter few cases PCB was delam after reflow, and the supplier was refuse that this is a PCB manufacturing defect as the fallout is low within one lot. the cost for this scrap is high after PCBA level, my query here are 1) is there any way
Electronics Forum | Wed Jul 11 13:34:57 EDT 2007 | pauld
Thanks Pete, I have plenty of Omega thermocouple leads on hand. By the way ECD is the mfg asking $989 for a probe that costs about $100, to which they add a pcb edge clamp.
Products, services, training & consulting for the assembly, rework & repair of electronic assemblies. BGA process experts. Manufacturers Rep, Distributor & Service Provider for Seamark/Zhuomao and Shuttle Star BGA Rework Stations.
Training Provider / Manufacturer's Representative / Equipment Dealer / Broker / Auctions / Consultant / Service Provider
1750 Mitchell Ave.
Oroville, CA USA
Phone: (888) 406-2830