Electronics Forum: pre-rework pcba bake process. (Page 1 of 2)

Baking time for PCBA rework

Electronics Forum | Mon Feb 04 12:30:25 EST 2002 | fmonette

Dave highlighted all the elements that must be considered to determine the optimal temperature and duration for a pre-rework PCBA bake process. As far as the component is concerned, it really depends if you care about not damaging the package for r

Drying PCB after contamination measurement for rework ?

Electronics Forum | Wed Mar 02 13:15:16 EST 2022 | chris007

I am currently working on a manufacturing flow where some PCBA are processed with reflow oven (after being baked before processing), then cleaned with bath, then passed into contaminometer, passed into AOI. The point is after all of this, if AOI dete

Reball BGA process flow

Electronics Forum | Wed Feb 02 13:05:51 EST 2005 | russ

Process flow 1.Remove part - It may be necessary to bake assembly prior to removing. 2.Remove remaining solder from part 3.Apply flux to part 4.Apply solder spheres to part 5.Reflow part You may want to bake component before re-installing 6.Apply

Baking time for PCBA rework

Electronics Forum | Wed Apr 24 21:35:34 EDT 2002 | davef

Ooooo, much better. Tough to say, because of all the variables [ie, different materials, moisture level, temperature, etc]. Plastic encapsulated devices, especially IC, absorb water from the air, which is violently released during soldering. Typica

PCBA was swollen after SMD

Electronics Forum | Wed Aug 11 06:27:07 EDT 2021 | danisa

Hi all, The PCBA was swollen after SMD It is hard PCBA with 6 layers and SMD both sides Defect rate: ~ 5% Phenomenon: swell at the same side, same position (at 2 IC positions). Did not find any abnormality in SMD process as well as storage condition.

PCBA Production Manufacturing Time Control

Electronics Forum | Thu Apr 14 17:24:06 EDT 2022 | cbart

depends on board finish and PCB substrate materials. If you were using OSP or silver finished bare boards the time to process is less than an ENIG or HASL finished. certain substrate material absorb more moisture than others or at a quicker rate. so

Baking time for PCBA rework

Electronics Forum | Wed Feb 06 19:28:43 EST 2002 | sleech

I agree with Francois. We have just announced a 55 deg. C LTVP drying process that can greatly speed moisture removal. It is also effective for drying components that remain in tape and reel, conductive plastic shipping tubes or trays. Process time

Warp PCBA- how to repair

Electronics Forum | Sun Jul 15 20:10:09 EDT 2001 | Danial

What is the best method to repair Warped PCBA. Obviuosly twisting it back to make it flat would be a disasterous. The method that I've tried wold be mounting the assembled board to the flat holder with the clamp and bake them at 120 Deg C for about 4

Baking time for PCBA rework

Electronics Forum | Tue Apr 23 18:34:45 EDT 2002 | mkallen

My first posting was not very clear -- sorry. Let me try again. What I want to know is: can I eliminate the drying (baking) process completely IF I know that the good parts (i.e., those not being reworked) are going to stay under some threshold tem

PCBA delam after reflow

Electronics Forum | Fri Aug 27 00:26:14 EDT 2004 | charly

hi, encounter few cases PCB was delam after reflow, and the supplier was refuse that this is a PCB manufacturing defect as the fallout is low within one lot. the cost for this scrap is high after PCBA level, my query here are 1) is there any way

  1 2 Next

pre-rework pcba bake process. searches for Companies, Equipment, Machines, Suppliers & Information

SMT Machines

Software programs for SMT placement and AOI Inspection machines from CAD or Gerber.
Blackfox IPC Training & Certification

Training online, at your facility, or at one of our worldwide training centers"
2024 Eptac IPC Certification Training Schedule

High Throughput Reflow Oven
2024 Eptac IPC Certification Training Schedule

Nozzles, Feeders, Spare Parts - Siemens, Fuji, Juki, Yamaha, etc...
design with ease with Win Source obselete parts and supplies

Training online, at your facility, or at one of our worldwide training centers"