Electronics Forum | Mon Jun 23 12:26:36 EDT 2008 | jdumont
We recently (6 months ago) started production with our Samsung SM421 w/ side tray handler and love it so far. Software can be somewhat buggy sometimes but they are working on it I am told. The side tray handler makes a huge difference not eating up a
Electronics Forum | Wed Oct 10 09:55:33 EDT 2018 | dnachristen
Hello! I have a calibration jig that handles both Philips / Assembleon and Samsung feeders. I have a power supply hooked up for the Samsung feeders, but would like to know if anyone has the pinout for those feeders so I can rig some kind of electroni
Electronics Forum | Sun Aug 07 14:37:50 EDT 2011 | franxsmt
Hi every body, Recently I got a vibration feeder for my SM421 Samsung machine. The feeder has no manual and I don't have any contact with Samsung people. I put the feeder into a feeder slot, the feeder goes on (a red lamp on the feeder indicates it
Electronics Forum | Thu Oct 04 00:05:25 EDT 2018 | gaintstar
Flason SMT chip mounter Reflow Ovens: http://www.flason-smt.com/product/PCB-assembly-line-equipment-SMT-spare-parts-Dek-Motor-188962.html http://www.flason-smt.com/product/PCB-Conveyor-for-LED-Production-Line-SMT-Assembly-Line.html http://www.flason-
Electronics Forum | Tue Jul 18 03:11:48 EDT 2017 | tsvetan
I recently bought: PCB Loader, Full Automatic Printer with vision with 10 seconds print time, 1 meter Inspection Conveyor, Samsung SM482+Feeders, 1 meter Inspection conveyor, Reflow oven for similar budged, all machines new. I bought them directl
Electronics Forum | Sat Jul 08 09:19:53 EDT 2006 | Larry
Samsung vs. Assembleon We currently have both Samsung/Dynatech and Assembleon Equipment. We started with two Samsung machines but the support, flexibility, component range, accuracy and speed of their machines just wasn�t there. The difference betw
Electronics Forum | Wed Feb 15 10:37:19 EST 2012 | caerleon
The only way you will be able to measure it is to count the reel before you put it on the machine, count them when they come off and deduct the amount expected to be placed. you will then have the result of attrition on the machine. or.. Pick the p
Electronics Forum | Tue May 24 15:39:04 EDT 2016 | spoiltforchoice
It seems a remarkable coup to have been awarded a grant without already having specified exactly why you want it, what you are going to spend it on and how it will benefit your business and the local area. I had an email about the Fox just the other
1 |