Electronics Forum: smt quicker setup time (Page 1 of 17)

operators on setup

Electronics Forum | Sat Aug 21 11:45:15 EDT 2004 | dror

hello i am a stundent from israel, i work in a smt company, and my assignment is to reduce stup in the smt line. i need a flow chart of the assignment operators have to do during a setup for a pcb manufacture. or any other material i can use to reduc

operators on setup

Electronics Forum | Fri Sep 10 00:02:14 EDT 2004 | Darren

Dror, If I understand your question correctly, you would like to know what the operators should be doing in what priority during setup or changeover? Simply stated if you are doing on line setup due to limitations in feeder quantity or manpower avail

Payback time

Electronics Forum | Wed Mar 06 10:55:17 EST 2002 | monty2224

We have developed a Cost of Ownership model that incorporates a number of factors when considering SMT equipment. There are the obvious ones like maintenance costs, labor costs and shift patterns. We also considere utilities, quality, set-up time a

smt costings

Electronics Forum | Tue Mar 31 09:22:48 EDT 2015 | rgduval

I've always hated using machine specs....they're always best case scenarios, and nearly never capture actual through-put rates. Personally, I don't like using first-piece rates, either...unless you're looking for worst case scenarios. Usually, the

SMT tact time

Electronics Forum | Wed Aug 25 19:35:48 EDT 2004 | russ

This is highly dependent upon your board, vision inspection, part rotation, part type, layout, number of P/Ns per (1 pers or 100 pers) feeder layout, optimization, nozzle changes, etc... all have significant impact on placement speed. I find if you

Re: smt reliability vs thru hole

Electronics Forum | Tue Jan 18 12:36:11 EST 2000 | Dave F

Dave: I haven't located something to support your contention, yet, and I'm not going to comment on the factors that drive reliability beyond component selection, because I know that you've got some sweaty-palmed sales type wringing his hands waiting

Mydata Users

Electronics Forum | Wed Apr 26 09:52:28 EDT 2006 | russ

So then to justify the 2400, you will need to calculate the decreased time for setup/changeover and what that costs your company. this will be justification. e.g. if it takes half as long to setup you save half the money. labor hours x employee co

Bottom side adheasive

Electronics Forum | Thu Dec 11 04:25:06 EST 2008 | lconnor

I have previously experienced dispensing glue dots using a camalot system. This was used to dispense dots for a variety of components, as the SMT was applied post through hole and then wave soldered. No paste was used in the process. The other benefi

Upgrading to less obsolete equipment.

Electronics Forum | Tue Aug 22 15:10:09 EDT 2006 | bobpan

Just to comment on the quad equipment side......The QSA-30 is also obsolete but you can use the same feeders on it as the 4c. The setup time would be the same but the speed is quicker (i think around 10k cph). If I were in your shoes....i think i wou

SMT Parts kitting

Electronics Forum | Tue Feb 01 10:34:13 EST 2011 | scotceltic

I am currently looking for a quicker more efficient way to kit our parts from pulling to the carousel to organizing feeder locations on our SMT equipment. Currently we pull our parts and place them on a rack in no particular order. (we have too many

  1 2 3 4 5 6 7 8 9 10 Next

smt quicker setup time searches for Companies, Equipment, Machines, Suppliers & Information

KingFei SMT Tech
KingFei SMT Tech

Main Products: 1. Original new and Original Used SMT/AI Spare Parts. 2. SMT Equipments And Related Machine( SMT Calibration, SMT Feeder Carts,Conveyer etc.) 3. Maintenace and Repair Service Pre-Sales Service Provide details ab

Manufacturer's Representative / Manufacturer / Equipment Dealer / Broker / Auctions / Consultant / Service Provider

3 Road Xintang, Fuhai Street,Fuyong
Shenzhen, 30 China

Phone: 13713862102