Electronics Forum | Mon Oct 12 00:55:02 EDT 2015 | edriansyah
Hi nhel, if you're talking about software back up. it's quite easy. normally when you're system are set by the SAKI tech, they will create a back up of the saki software. this is their standart procedure. mine were located on the My document. he put
Electronics Forum | Thu Sep 24 09:28:13 EDT 2015 | rgduval
No direct experience with this particular issue....but, I do know that measuring capacitance can be tricky. How are you arriving at this conclusion? Are you measuring the caps on the bench before assembly, and then on the boards post assembly? Cap
Electronics Forum | Sat Sep 26 02:09:39 EDT 2015 | aemery
Proc My field service back ground included Electrovert so I know reflow electrical quite well. I've worked on Heller, Conceptronic and Vitronics over the last few years and really there isn't a huge difference if you can read a schematic. I checked
Electronics Forum | Sat Sep 26 14:54:52 EDT 2015 | ercdave1
Hello, just a quick update on this issue. I disabled head 2 on beam 2 which was the second head I worked on, and left only active the head that I had work with first and ran dry cycle with. after disabling the head 2, the machine zeroed with no pr
Electronics Forum | Wed Sep 30 08:29:15 EDT 2015 | johanbergstrom
The difference between TMC Flex and TMD Flex is about the ability to feed component tape with deep pockets for larger components. The TMC have a rather low passage for embossed component tape. While TMC Flex is limited to a maximum tape depth of 7,5
Electronics Forum | Tue Oct 06 14:29:14 EDT 2015 | cadco
Update 6 Oct 15: We have completely re-configured the oven PID boards such that everything is now visible on the oven by the s/w and all is now OK since the "Machine"card is now recognized. We have just one additional procedure to do and that is to
Electronics Forum | Sat Oct 10 11:24:50 EDT 2015 | cusackmusic
I've been running Quads for over 10 years, and I love them. I've had almost every model, from the 100, to our current IVCs, and QSP2. We are getting busier, and I'm thinking about upgrading. I have TONS of feeders, so the simple solution would be t
Electronics Forum | Fri Oct 16 10:20:40 EDT 2015 | markhoch
I don't have time to go in depth, but I will say this.. Considering onsite Service... Please please PLEASE make sure your Service Engineers travel with tools. I'm very tired of having to scramble to find tools for FSE's who show up at my facility wit
Electronics Forum | Thu Oct 22 05:36:58 EDT 2015 | myleb
Hi Nhel, It's quite strange problem here... 1. The voltage check: please supply power voltage. Inside machine (BF) there is a transformer, please make sure the voltage setup is correct. 2. In Ringload information, please see the 12V and 24V, is it
Electronics Forum | Mon Nov 02 07:56:23 EST 2015 | emeto
this is very touchy.There are many CPMs out there. Which one is the best for you though is what you should figure out. I think your boards density, quantities and variety assemblies will define that. One of our customers has around 1000 different ass