Electronics Forum | Fri Sep 15 09:14:55 EDT 2017 | dleeper
From my perspective, I like marked parts because I can use AOI to verify the correct parts are being placed in production. If an operator is going to load the wrong reel, I prefer to find out on the first PCB rather than after 5000 wrong parts have b
Electronics Forum | Tue Oct 14 17:45:56 EDT 2014 | eezday
One Table...One feeder...One reel...no mistakes
Electronics Forum | Sun Apr 25 08:06:47 EDT 2021 | pradeep14
Presently we are facing wrong loading of zener diode components in SMT Line. * In the particular product, we have two different part numbers of zener diode but the package and color code is same.Only the voltage is different is there in between two p
Electronics Forum | Tue Jan 28 16:34:34 EST 2020 | spoiltforchoice
I genuinely think component verifier on the machine is the optimum solution. Even then it can probably get caught out, we build some instrumentation that can have 10K 1%, 10K 0.1% and 10k 0.1% 2ppm, a verifier won't catch those getting mixed up,likew
Electronics Forum | Mon Oct 23 15:42:46 EDT 2000 | Jeff
Bach, I was previously an SMT Supervisor with 5 years battling this issue. The following formula has worked well for me after I figured it out - whoich took a long process of trying out new approaches. 1. Production Supervisors must believe they c
Electronics Forum | Tue Oct 14 09:51:20 EDT 2014 | rgduval
I've always used multiple verification, and it's worked rather well. But, it depends on the people that are doing the verification, and their commitment to accuracy. It also requires a little bit of extra time. Given your system, are you still get
Electronics Forum | Mon Mar 09 11:05:07 EDT 2009 | KP
The mydata machines are using different packages. Since we know the part numbers and packages affected, would it be posible to load some sort of offset file to correct this before sending it to the machines?
Electronics Forum | Mon Apr 26 18:45:32 EDT 2021 | rgduval
I've had the most success in a check/double-check set up. Most people will tell you that it's labor intensive, and they're not wrong. However, I suspect that those people have never had to manually change two components on a thousand boards at a sh
Electronics Forum | Thu Nov 13 06:17:23 EST 2014 | aj
We use Buddy check system + part measure prior to all parts being loaded onto the machines...this is a manual approach but we haven't had a misload in years.... It has been mentioned above but the Operators have a huge role to play no matter what sy
Electronics Forum | Thu May 26 12:21:04 EDT 2005 | stepheniii
We have dek-my12-my12-heller. We are very happy with it. Change-over time varies more by facility than by machine type. I worked at a place with dek-mviif-msf-btu and we had faster changeovers there. There we had a dedicated feeder set-up. Close to