Electronics Forum | Sat Jan 19 23:23:45 EST 2008 | bentigano
I'm not familiar with SPC Plus. I'll assume it's a "statical process control" system. We use the SPC data collected by our YesTech AOI system, together with a custom, web-based reporting system for process analysis and defect reporting. I am actually
Electronics Forum | Sat Dec 09 12:27:16 EST 2006 | bentigano
The company that I work for is a high-mix, mid-high volume manufacturer, and we also chose the YesTech AOI equipment. We currently have a YTV-2050 (the conveyorized machine with 5 cameras), and also the YTV-1000 (table-top version of the YTV-2050, wi
Electronics Forum | Wed Oct 22 16:51:36 EDT 2008 | inge_fi
I had some trials with AOI machines, most I saw Yestech and Saki desktop machines. For the software interface I much prefer Yestech which is very easy to use. But honestly for faults foundings and flexibility Saki is much better, the only thing is th
Electronics Forum | Thu Apr 05 16:13:12 EDT 2007 | Ben T
D?rty, I was actually under the same mission as you a little over a year ago, but have since given up on the impossible. I have however been developing software for the industry for the past year. I have made a BOM importing tool, which cleans the BO
Electronics Forum | Thu Aug 04 09:27:25 EDT 2011 | rway
Software, software, software. It always seems to be related to any hardware issues we experience with our systems. Can you expound on "crash?" How does the software crash, what are the symptoms. Does it just lock up and become unresponsive, camer
Electronics Forum | Tue Aug 15 05:03:30 EDT 2023 | alishakihn
When it comes to F1 AOI (Automated Optical Inspection) machines, there are various models and manufacturers available on the market. While specific features and capabilities may vary between different F1 models, here are some general factors to consi
Electronics Forum | Fri May 27 08:30:04 EDT 2005 | FFagundes
I think I have everyone beat. I work for a small Contract Manufacturer, and we are trying to grow our business. We generally have two or 3 different jobs running at the same time and up to 10 different jobs running in a day. So we needed to find a
1 |