Electronics Forum: z cyber laser height (Page 1 of 3)

Solder paste height measurement

Electronics Forum | Tue Jul 13 16:19:05 EDT 2004 | Inspection Solution

Hi Mark, There are many tools available for measuring solder paste height. Most machines use laser as the basis for inspection while others use structured white light. If simple height and width inspection is all that is required, you can look int

Quad IVc Laser Align Extents

Electronics Forum | Fri May 06 09:33:22 EDT 2011 | jimlas53

RLM, you have been very helpful! Let me try this on you: We have two IVC's, one with a conveyor and Quadalign, the other with a workholder platform and Cyber-optic. I just ran the first successful assembly on this second system, but the extents had

QUAD 4C Laser problem

Electronics Forum | Thu Sep 05 21:31:36 EDT 2013 | nophsem

Hi: Our machine (QUAD 4C) has a CyberOptics laser 6604033; when initialize at HOME, z-rod descends and doesn't retracts, which makes me think that the laser is misaligned, here's a link to the video recording: http://www.youtube.com/watch?v=W9ma7Zsf

Quad 4C pickup limit error

Electronics Forum | Thu Sep 08 13:07:18 EDT 2016 | claudea2

Hello Bob, we changed the nozzle z parameter until we got limit errors and backed up 1 mil. There was a slight reduction in the limit errors on the pickup of the component but it is still a problem. With the mod code we adjust the soft z height to ab

Quad 4C pickup limit error

Electronics Forum | Thu Sep 08 15:45:21 EDT 2016 | claudea2

Thanks Bob, I will change the z-rod just to make sure. It is a tall part read at 180. The nozzle height bugs me because we have 3 machines and the first one has a nozzle height of 238 while the 2 others around 200. I am thinking this parameter may ad

QUAD 4C mk2 Z axis

Electronics Forum | Mon Feb 04 11:01:44 EST 2013 | bobpan

The way its supposed to work...is....when you do a function 30 the z axis should step down until the nozzle tip is seen in the quad align or laser align. The readout should have a nozzle height but if its the earlier firmware for the machine it might

Quad 4c Nozzle Height Saga

Electronics Forum | Tue Oct 10 12:32:08 EDT 2006 | RLM

Larry, I have had this problem in the past. It turns out that there wasn't enough "Z" on our nozzle pickup locations. When a nozzle change occured the nozzle would not be fully seated on the Z-rod. When the Z-rod is driven down to pick the first part

Quad 4c pretending to place components

Electronics Forum | Mon Sep 25 09:42:51 EDT 2006 | slthomas

It sounds like it's just failing the laser align step. Try changing the align type for the part to "2" and see if it places it. If it's failing the laser align and you have valid part dimensions I can't help much but you might consider opening up th

SPC on SMT

Electronics Forum | Fri Nov 23 03:40:09 EST 2001 | ianchan

Hi All, agree 100% on product characteristics SPC, and do find process indicators such as paste Volume, useful to monitor via SPC, the printing process, as printing constitutes "70% cases of SMT defects". We juz purchased a 2nd hand CyberOptics 3D

Solder Paste Printed Volume

Electronics Forum | Sun Nov 25 22:54:20 EST 2001 | ianchan

Hi All, We juz purchased a 2nd hand CyberOptics 3D paste inspection machine (what a mouthful...) and am seeking info : 1) what formulae is applicable, to calculate the deposited solder paste volume onto the pre-defined PCB pads? 1.a) from our obse

  1 2 3 Next

z cyber laser height searches for Companies, Equipment, Machines, Suppliers & Information

SMT feeders

Nozzles, Feeders, Spare Parts - Siemens, Fuji, Juki, Yamaha, etc...
2024 Eptac IPC Certification Training Schedule

Have you found a solution to REDUCE DISPENSE REWORK? Your answer is here.
2024 Eptac IPC Certification Training Schedule

Software programs for SMT placement and AOI Inspection machines from CAD or Gerber.
PCB Depanelizers

Private label coffee for your company - your logo & message on each bag!