Partner Websites: allowed (Page 2 of 40)

Meeting Room and Exhibitor Networking Functions | IPC APEX EXPO 2021

| https://ipcapexexpo.org/exhibitors/meeting-room-and-exhibitor-networking-functions

to the close of the event. What is allowed? You are always allowed to meet with your employees and customers. However, any function during the "official program" and event hours is prohibited

Hide AND Remove pin in same footprint - PCB Libraries Forum

PCB Libraries, Inc. | https://www.pcblibraries.com/Forum/topic1498&OB=DESC.html

    Posted: 12 Dec 2014 at 11:21am Mixing hidden and missing pins is not allowed. It has to do with the format of the fpx library file. This part can be built in the FP Designer tho

PCB Libraries, Inc.

Hide AND Remove pin in same footprint - PCB Libraries Forum

PCB Libraries, Inc. | https://www.pcblibraries.com/forum/hide-and-remove-pin-in-same-footprint_topic1498.html

-g6b.pdf Here, pins 2 and 5( or seven 7) are effectively hidden while the rest of the unused pins are removed (not counted). Is there a reason this flexibility will not be allowed

PCB Libraries, Inc.

Hide AND Remove pin in same footprint - PCB Libraries Forum

PCB Libraries, Inc. | https://www.pcblibraries.com/forum/topic1498&OB=ASC.html

-g6b.pdf Here, pins 2 and 5( or seven 7) are effectively hidden while the rest of the unused pins are removed (not counted). Is there a reason this flexibility will not be allowed

PCB Libraries, Inc.

Hide AND Remove pin in same footprint - PCB Libraries Forum

PCB Libraries, Inc. | https://www.pcblibraries.com/forum/topic1498&OB=DESC.html

    Posted: 12 Dec 2014 at 11:21am Mixing hidden and missing pins is not allowed. It has to do with the format of the fpx library file. This part can be built in the FP Designer tho

PCB Libraries, Inc.

75% Barrel Fill Requirement for Class 2 Change in J-STD-001 Revision F - EPTAC - Train. Work Smarter

| https://www.eptac.com/faqs/ask-helena-leo/ask/75-barrel-fill-requirement-for-class-2-change-in-j-std-001-revision-f

: Why did the IPC change the barrel fill requirement for Class 2 in J-STD-001 Revision F? Revision E allowed 50% when there was a thermal plane. Now, Rev. F states 75

75% Barrel Fill Requirement for Class 2 Change in J-STD-001 Revision F - EPTAC - Train. Work Smarter

| https://www.eptac.com/ask/75-barrel-fill-requirement-for-class-2-change-in-j-std-001-revision-f/

: Why did the IPC change the barrel fill requirement for Class 2 in J-STD-001 Revision F? Revision E allowed 50% when there was a thermal plane. Now, Rev. F states 75

SolderTips: Problems With Stress Cracks in Ceramic Components - EPTAC - Train. Work Smarter. Succeed

| https://www.eptac.com/soldertip/soldertips-problems-with-stress-cracks-in-ceramic-components/

: We are having a problem with ceramic SMT components (CAPS) showing stress patterns and cracking after thermal testing. Have you ever seen this and if so, what is allowed or acceptable according to IPC standards, even with the lack of verified electrical failure of these components

SolderTips: Problems With Stress Cracks in Ceramic Components - EPTAC - Train. Work Smarter. Succeed

| https://www.eptac.com/faqs/soldertips/soldertip/soldertips-problems-with-stress-cracks-in-ceramic-components

. Have you ever seen this and if so, what is allowed or acceptable according to IPC standards, even with the lack of verified electrical failure of these components?     Question


allowed searches for Companies, Equipment, Machines, Suppliers & Information

SMT feeders

Wave Soldering 101 Training Course
Selective Soldering Nozzles

High Precision Fluid Dispensers
2024 Eptac IPC Certification Training Schedule

Best Reflow Oven
Global manufacturing solutions provider

Training online, at your facility, or at one of our worldwide training centers"
PCB Handling with CE

World's Best Reflow Oven Customizable for Unique Applications
Fully Automatic BGA Rework Station

"回流焊炉"