GPD Global | https://www.gpd-global.com/co_website/pdf/doc/FLOware-Import-Export-Data-Reference-Guide-22100024R-v2-9-3P.pdf
, ScaleRecal, UseTempCtl, MatlTemp, NeedleTemp, PreHeatTemp, PostHeatTemp, WorkAreaTemp, and PastMatlLimit. DFLTVAL Add Theta. PECLOC Add TargetZ. Change CleanNdl2X, Y, and Z definition from “camera at the end...” to “camera at the second point...” Add
GPD Global | https://www.gpd-global.com/pdf/doc/FLOware-Import-Export-Data-Reference-Guide-22100024R-v2-9-3P.pdf
, ScaleRecal, UseTempCtl, MatlTemp, NeedleTemp, PreHeatTemp, PostHeatTemp, WorkAreaTemp, and PastMatlLimit. DFLTVAL Add Theta. PECLOC Add TargetZ. Change CleanNdl2X, Y, and Z definition from “camera at the end...” to “camera at the second point...” Add
GPD Global | https://www.gpd-global.com/pdf/doc/FLOware-Import-Export-Data-Reference-Guide-22100024R.pdf
, ScaleRecal, UseTempCtl, MatlTemp, NeedleTemp, PreHeatTemp, PostHeatTemp, WorkAreaTemp, and PastMatlLimit. DFLTVAL Add Theta. PECLOC Add TargetZ. Change CleanNdl2X, Y, and Z definition from “camera at the end...” to “camera at the second point...” Add
Surface Mount Technology Association (SMTA) | https://www.smta.org/icsr/speaker_forms/Paper-Format-Requirements.doc
dissolution results of each alloy at both 30 and 50 second exposure times. The values on the y-axis are the measured remaining Cu thickness of the knee plating after a 30 and 50 second exposure to molten solder (x-axis). The alternative Pb-free alloys have been
GPD Global | https://www.gpd-global.com/pdf/doc/Dispense-System-Service-Guide-22290008G.pdf
, be sure to maintain conveyor height and alignment settings so the exit end of the conveyor is within 1/32” (0.8 mm) of the downstream conveyor. c. Repeat the two previous steps for the Y-axis linear rail. 3/30/22 Dispense System Service Guide 2.3 GPD
GPD Global | https://www.gpd-global.com/co_website/pdf/doc/Dispense-System-Service-Guide-22290008G.pdf
conveyor. c. Repeat the two previous steps for the Y-axis linear rail. 5/18/18 Dispense System Service Guide 2.3 GPD Global© Installation: Installation Procedure Install System After the machine is aligned and leveled, perform the following steps: 1. Install
| https://www.smtfactory.com/Development-Stage-of-SMT-Pick-and-Place-Machine-id47535177.html
accuracy was not high (X-Y positioning + 0.1mm, pick and place accuracy + 0.25mm), And the function is simple, but it already has all the elements of a modern pick and place machine