GPD Global | https://www.gpd-global.com/pdf/doc/Dispense-System-Service-Guide-22290008G.pdf
machine may need to be leveled both before and after the tie down procedure. If tie down clamps are NOT required, skip to Level Machine. 1. Prepare floor as needed using Spacing & Locations (pg 7.11). 2. Verify a minimum of 30 mm of the foot screw thread is
GPD Global | https://www.gpd-global.com/co_website/pdf/doc/Dispense-System-Service-Guide-22290008G.pdf
• Forklift (2 ton capacity) • End wrench • Air lines (capacity of 4 CFM @ 87 psi [113 l/min @ 600 kPa]) • Power cord plug The equipment is provided with a main power inlet; main equipment over-current protection must be provided from the facility dedicated
1 |