| https://unisoft-cim.com/sample-library_assembly-cost-by-part-number.html
. For example on the first line for part number 391727-10-9 those components will be assembled on a Mydata/Mycronic assembly machine with a placement rate of 8000 components per hour and the overhead
Baja Bid | https://bajabid.com/wp-content/uploads/2021/05/MY300-SX-Brochure.pdf
. ELECTRICAL VERIFIER (OPTIONAL) Component range Resistor, capacitor, unipolar capacitor, diode (forward voltage, reverse current), Zener diode (voltage drop), transistor (current gain) LINESCAN VISION SYSTEM - 2K RESOLUTION COMPONENT TYPE FIELD OF VIEW MIN PITCH MIN LEAD WIDTH Leaded components 63 mm
| https://unisoft-cim.com/place_download.htm
origin 0,0 for the PCB, then repeat the previous process to set it to the XY origin 0,0. Building the top side assembly placement (mount) file: Click PLACE/AOI/X-Ray MODELS from the top menu then click MYDATA, then click on TPSys (note the older
| https://unisoft-cim.com/test-fixture_download.htm
from the a .CA8/.CA9 file. The test status summary file, which is created at the same time as the Unisoft software creates the .CA9 file, will list all the capacitor reference designators that are being tested via CPAR and it looks like the following in
| https://unisoft-cim.com/view-markup_download.htm?taguni=from-tooltips
SAMPLE.OPR to select it then click OPEN. The result is that under the OPERATION field at the bottom of the screen each part number has been automatically assigned a operation step, for example Part Number 390579-03-3 is assigned Operation "Mydata / Mycronic
| https://unisoft-cim.com/aoi_download.htm
Number 390579-03-3 is assigned Operation "Mydata / Mycronic AUTO INSERT". The Operation field is optional and it is easily populated by the .OPR file which is a simple text file. The .OPR file contains the Part Number followed by a tab then the Operation
| https://unisoft-cim.com/gerber-connection_download.htm
to select it then click OPEN. The result is that under the OPERATION field at the bottom of the screen each part number has been automatically assigned a operation step, for example Part Number 390579-03-3 is assigned Operation "Mydata / Mycronic AUTO
| https://unisoft-cim.com/soldering_download.htm
is assigned Operation "Mydata / Mycronic AUTO INSERT". The Operation field is optional and it is easily populated by the .OPR file which is a simple text file. The .OPR file contains the Part Number followed by a tab then the Operation text for that
1 |