Technical Library: 3 and sigma (Page 3 of 5)

Reliability of Embedded Planar Capacitors under Temperature and Voltage Stress

Technical Library | 2015-05-21 18:46:31.0

In this work the reliability of an embedded planar capacitor laminate under temperature and voltage stress is investigated. The capacitor laminate consisted of an epoxy-BaTiO3 composite sandwiched between two layers of copper. The test vehicle with the embedded capacitors was subjected to a temperature of 125oC and a voltage bias of 200 V for 1000 hours. Capacitance, dissipation factor, and insulation resistance were monitored in-situ. Failed capacitors exhibited a sharp drop in insulation resistance, indicating avalanche breakdown. The decrease in the capacitance after 1000 hours was no more than 8% for any of the devices monitored. The decrease in the capacitance was attributed to delamination in the embedded capacitor laminate and an increase in the spacing between the copper layers.

CALCE Center for Advanced Life Cycle Engineering

Step Stencil design when 01005 and 0.3mm pitch uBGA's coexist with RF Shields

Technical Library | 2023-07-25 16:50:02.0

Some of the new handheld communication devices offer real challenges to the paste printing process. Normally, there are very small devices like 01005 chip components as well as 0.3 mm pitch uBGA along with other devices that require higher deposits of solder paste. Surface mount connectors or RF shields with coplanarity issues fall into this category. Aperture sizes for the small devices require a stencil thickness in the 50 to 75 um (2-3 mils) range for effective paste transfer whereas the RF shield and SMT connector would like at least 150 um (6 mils) paste height. Spacing is too small to use normal step stencils. This paper will explore a different type of step stencil for this application; a "Two-Print Stencil Process" step stencil. Here is a brief description of a "Two-Print Stencil Process". A 50 to 75 um (2-3 mils) stencil is used to print solder paste for the 01005, 0.3 mm pitch uBGA and other fine pitch components. While this paste is still wet a second in-line stencil printer is used to print all other components using a second thicker stencil. This second stencil has relief pockets on the contact side of the stencil any paste was printed with the first stencil. Design guidelines for minimum keep-out distances between the relief step, the fine pitch apertures, and the RF Shields apertures as well relief pocket height clearance of the paste printed by the first print stencil will be provided.

Photo Stencil LLC

Maintenance and operation of walk-in temperature humidity test chamber

Technical Library | 2019-11-17 22:46:45.0

Overview of walk-in temperature and humidity chamber: It also belongs to environmental test equipment, it tests whether the product can resist high temperature, low temperature, humidity, or the physical and chemical changes produced under extreme conditions, the walk-in temperature and humidity chamber volume is large, the product is placed, or a large object can be placed, such as automobile, new energy, television and liquid crystal screen, etc. How to do the routine maintenance of the walk-in temperature and humidity chamber: 1. The wet gauze basically, if there is no special case, s/b usually changed once in 3 months 2. The water channel shall be regularly cleaned, including water cup, water tank, etc., so as to prevent the water from being blocked,affect the humidity test. 3. It is forbidden to test the flammable and explosive products inside working room. 4. Clean the chamber on a regular basis 2. How to operate walk-in temperature and humidity chamber: The operation method is same as standard temperature humidity test chamber,the controller is 7-inch LCD programmable color screen, you only need to setthe temperature point---test time--how many cycles need to be tested, This can be done automatically, and the machine will stop automatically when it is complete. If there is any problem during the operation, the corresponding problem point will be displayed on the machine control screen. Walk-in temperature and humidity chamber is a must equipment for reliability test of Automobile,Aerospace,Electronic parts,etc,the operation and maintenance are easy,it is teh tear down mahcine,Climatest engineers will be dispatched to do on-site support,for instance,we will finish commissioning,train customers how to operate,maintain,welcome to follow our company facebook page:https://www.facebook.com/Climatechambers

Symor Instrument Equipment Co.,Ltd

An Experimental and Computational Study of the Current Carrying Capacity of High Performance PWB Interconnections

Technical Library | 2009-01-01 16:37:38.0

Recent technology advancement has enabled enhancement in PWB electrical performance and wiring density. These innovations have taken the form of improved materials, novel PWB interconnect structures, and manufacturing technology. One such advancement is Z-axis conductive interconnect. The Z-interconnect technology involves building mini-substrates of 2 or 3 layers each, then assembling several mini-substrates together using conductive paste.

i3 Electronics

Enhancing Thermal Performance in Embedded Computing for Ruggedized Military and Avionics Applications.

Technical Library | 2014-07-17 17:01:10.0

Embedded computing systems used in many military and avionics applications are trending toward higher heat fluxes, and as a result performance is being hindered by thermal limitations. This is intensified by the high ambient conditions experience by today’s modern warfighter. In many applications liquid cooling is replacing air flow through chassis for both thermal and environmental benefits(...) This paper outlines a series of passive thermal improvements which are easily integrated into legacy, or existing, systems and can provide a 3-4x increase in dissipated power.

Advanced Cooling Technologies

Designing a High Performance Electroless Nickel and Immersion Gold to Maximize Highest Reliability

Technical Library | 2020-11-15 21:22:11.0

The latest highest reliability requirements demand a high performance electroless nickel and immersion gold (HP ENIG). The new IPC specification 4552A has refocused the industry with reference to nickel corrosion. The interpretation of the existing specification, that judges corrosion on 3 levels, is complex and if misinterpreted can lead to phantom failures. An obvious way to avoid any potential misinterpretation is to eradicate any evidence of corrosion completely.

Atotech

Effect of Reflow Profile on SnPb and SnAgCu Solder Joint Shear Force

Technical Library | 2007-03-08 19:31:10.0

Reflow profile has significant impact on solder joint performance because it influences wetting and microstructure of the solder joint. The degree of wetting, the microstructure (in particular the intermetallic layer), and the inherent strength of the solder all factor into the reliability of the solder joint. This paper presents experimental results on the effect of reflow profile on both 63%Sn 37%Pb (SnPb) and 96.5%Sn 3.0%Ag 0.5%Cu (SAC 305) solder joint shear force.

Henkel Electronic Materials

Stress Analysis and Optimization of a Flip Chip on Flex Electronic Packaging Method for Functional Electronic Textiles

Technical Library | 2020-12-24 02:50:56.0

A method for packaging integrated circuit silicon die in thin flexible circuits has been investigated that enables circuits to be subsequently integrated within textile yarns. This paper presents an investigation into the required materials and component dimensions in order to maximize the reliability of the packaging method. Two die sizes of 3.5 mm×8 mm× 0.53 mm and 2 mm×2 mm×0.1 mm have been simulated and evaluated experimentally under shear load and during bending. The shear and bending experimental results show good agreement with the simulation results and verify the simulated optimal thickness of the adhesive layer. Three underfill adhesives (EP30AO, EP37-3FLF, and Epo-Tek 301 2fl), three highly flexible adhesives (Loctite 4860, Loctite 480, and Loctite 4902), and three substrates (Kapton,Mylar, and PEEK) have been evaluated, and the optimal thickness of each is found. The Kapton substrate, together with the EP37-3FLF adhesive, was identified as the best materials combination with the optimum underfill and substrate thickness identified as 0.05 mm.

University of Southampton

Notices in the use of temperature and humidity Test Chamber

Technical Library | 2019-05-06 23:04:05.0

The temperature and humidity test chamber simulate the temperature and humidity, so there are a lot of things customers shoud notice in the process of use, although there is detailed instruction when purchasing the equipment. But some users just know how the device works and start using it. This is very easy to cause problems in the use of the equipment, so Symor intends to describe the safety details during the use of temperature and humidity chamber. 1. Before the test, determine if the sample contains flammable and explosive substances to avoid combustion or explosion during the test. Of course, also make sure there is no flammable and explosive material around the test equipment, otherwise it may cause fire and other accidents. 2, Do not open the chamber door to operate during the experiment, or the gas in the studio may cause the operator to burn and so on. 3. At the end of the test or at the time of regular cleaning of the test chamber, power off the equipment to avoid electrocution accidents. Also, when cutting off the equipment power, pull the power cord to pull out the plug, otherwise it may lead to a rupture of the power cord and so on. You can contact manufacturers if there are some places you donnot understand, do not dismantle and repair the temperature and humidity test chamber without authorization, otherwise it may lead to more serious problems.

Symor Instrument Equipment Co.,Ltd

Dust removal in temperature and humidity Test Chamber (2/2)

Technical Library | 2019-05-21 00:21:26.0

Continue to talk about the dust removal from temperature humidity test chamber. Cleaning and maintenance: 1) Pls remove internal impurities inisde chamber before operation. 2) The power distribution room should be cleaned at least once a year, and the dust can be removed by vacuum cleaner. 3) The exterior chamber must also be cleaned more than once a year, which can be wiped with soapy water. Inspection and maintenance of humidifier: The water storage in humidifier should be replaced once a month to ensure clean water quality, humidifying water tray should be cleaned once a month to ensure smooth flow of water. The inspection of over-temperature protector:during the test: If the temperature is over 20 ℃ ~ 30 ℃ than the maximum value setted,the power supply of the heater will stop, the "OVERHEAT" overt-emperature warning light will automatically turn on but the fan is still in operation, if the equipment runs without operator around,the operator should check the over-temperature protector in advance to ensure wether it has been setted properly before start [wet ball over-temperature protector set to 120 ℃].

Symor Instrument Equipment Co.,Ltd


3 and sigma searches for Companies, Equipment, Machines, Suppliers & Information

2024 Eptac IPC Certification Training Schedule

Software programs for SMT placement and AOI Inspection machines from CAD or Gerber.
Blackfox IPC Training & Certification

High Throughput Reflow Oven
SMTAI 2024 - SMTA International

World's Best Reflow Oven Customizable for Unique Applications


Software for SMT placement & AOI - Free Download.