Technical Library | 2022-10-31 09:01:25.0
Delivery Time: 1-2 Days Attributes: Original New Material: Metal Shipping Ways: DHL, FedEx, TNT, UPS, By Sea,DDP Dedicated Line Color: Black Certification: ISO
Technical Library | 2015-06-30 22:02:41.0
This paper describes the losses from defects at the placement process in the SMT line. Two case studies of European and Taiwanese SMT manufacturers illustrate the actual losses from their defects. An evaluation method to select a pre-reflow AOI system maximizing the return on investment (ROI) is introduced. In the end, ROIs of three commercial pre-reflow AOI systems are compared to demonstrate the importance of selecting an appropriate AOI system. This paper will increase the probability that anyone installing an AOI system during the pre-reflow process will obtain a successful gain with short payback period.
1 |