Technical Library | 2023-01-17 17:19:44.0
A test program was developed to evaluate the effectiveness of vacuum reflow processing on solder joint voiding and subsequent thermal cycling performance. Area array package test vehicles were assembled using conventional reflow processing and a solder paste that generated substantial void content in the solder joints. Half of the population of test vehicles then were re-processed (reflowed) using vacuum reflow. Transmission x-ray inspection showed a significant reduction in solder voiding after vacuum processing. The solder attachment reliability of the conventional and vacuum reflowed test vehicles was characterized and compared using two different accelerated thermal cycling profiles. The thermal cycling results are discussed in terms of the general impact of voiding on solder thermal fatigue reliability, results from the open literature, and the evolving industry standards for solder voiding. Recommendations are made for further work based on other void reduction methods and additional reliability studies.
Technical Library | 2023-01-17 17:22:28.0
The impact of voiding on the solder joint integrity of ball grid arrays (BGAs)/chip scale packages (CSPs) can be a topic of lengthy and energetic discussion. Detailed industry investigations have shown that voids have little effect on solder joint integrity unless they fall into specific location/geometry configurations. These investigations have focused on thermal cycle testing at 0°C-100°C, which is typically used to evaluate commercial electronic products. This paper documents an investigation to determine the impact of voids in BGA and CSP components using thermal cycle testing (-55°C to +125°C) in accordance with the IPC- 9701 specification for tin/lead solder alloys. This temperature range is more typical of military and other high performance product use environments. A proposed BGA void requirement revision for the IPC-JSTD-001 specification will be extracted from the results analysis.
Technical Library | 2023-08-16 18:16:05.0
A global aerospace and defense leader requested a capability test of small volume solder paste dispensing on FR4 circuit boards.
Technical Library | 2023-08-16 18:09:06.0
One of our customers involved with Electronics and Aerostructures requested a test to dispense Techspray Wondermask 2204 solder mask. The dispensing locations include large and small screw holes, single through-hole vias, and connector locations consisting of multiple through-hole vias. The process needed to run quickly and reliably.
Technical Library | 2023-09-07 14:38:31.0
A repeat customer specializing in high-technology interconnect, sensor, and antenna solutions, partnered with us to dispense small volumes of solder paste (Indium 10.1 SAC305 T6SG 78%m) onto backplane connectors – gold pads 0.175mm x 0.225mm. We performed a test requiring 0.200mm diameter or smaller dots to demonstrate the dispensing capability required.
Technical Library | 2007-02-01 09:36:26.0
Purpose: Compare the Surface Insulation Resistance of reworked BGA Test samples made with standard solder balls using a flux only reattachment and samples made including the StencilQuik™ product from Best Inc. with solder balls using a flux only reattachment.
Technical Library | 2007-01-31 15:17:04.0
The goal of this project is to evaluate the reliability of lead-free BGA solder joints with a variety of different pad sizes using several different BGA rework methods. These methods included BGAs reworked with both flux only and solder paste attachment techniques and with or without the use of the BEST stay in place StencilQuick™. The daisy chained test boards were placed into a thermal test chamber and cycled between -25ºC to 125ºC over a 30 minute cycle with a 30 minute dwell on each end of the cycle. Each BGA on the board was wired and the continuity assessed during the 1000 cycles the test samples were in the chamber.
Technical Library | 2007-06-21 17:03:16.0
The rapid assimilation of Ball Grid Array (BGA) and other Area Array Package technology in the electronics industry is due to the fact that this package type allows for a greater I/O count in a smaller area while maintaining a pitch that allows for ease of manufacture (...) While there have been several studies comparing these two attachment methods, this study highlights the effect of rework technique on the electrical characteristics and reliability of reworked BGAs.
Technical Library | 2019-05-29 23:10:30.0
There are times when a PCB prototype needs to be built quickly to test out a design. In such cases where it is known early on that there will be multiple iterations or that a "one and done" assembly will be made that there will be some SMT assemblers who choose to hand print solder paste onto the board using a "frameless" stencil. In such cases where hand printing is used, the consistency of the printing technique has typically been in question. Furthermore, the effectiveness of both the nanocoatings as well as the higher end stainless steel materials, which have been heretofore studied in controlled printing environments, will be evaluated for their impact on the hand printing process.The purpose of the study was to determine the effectiveness of select nanocoating materials as well as certain high end stainless steel stencil materials as they relate to the manual SMT printing process. A variety of nanocoatings were applied to SMT metal stencils and solder paste volume measurements were taken to compare the effectiveness.
Technical Library | 2019-11-20 22:44:25.0
Salt spray test chamber is used to test teh salt corrosion resistance ability of hardware, metal and other auto parts,the chamber can quickly detect the corrosion resistance degree of products in the temperature, humidity and salt spraying environment, which can effectively improve production efficiency. So what is the reason why such a salt spray test chamber does not spray? As per our past maintenance experience,there are below reasons,customers can have a look,hope it is helpful: 1, the spray tower is blocked; 2, water pipes clogged, water flow can not go in; 3, the air compressor stops running,pls open the air compressor button; 4, main switch of the air compressor outlet is not turned on,pls turn on. 5, the solenoid valve fails, the pressure meter is broken or the pressure is too low, pls check with Climatest and repair it. 6, when the nozzle is clogged, the nozzle should be carefully removed and cleaned,because it is fragile. 7, if the spray pressure is normal, the position of the nozzle glass is also correct, but what is the reason for not spraying? In this case, it is necessary to carefully observe whether there is dirt at the contact surface of the nozzle. If so, clean up the dirt and the spray can be carried out normally. That‘s all we‘re going to talk about today. If you have any questions, follow us on facebook, Please feel free to ask us questions.