Technical Library: how to install tpsys (Page 1 of 1)

How to calibrate JUKI CF feeder

Technical Library | 2017-07-21 03:23:47.0

1.Choose a feeder with best chip-placement ratio, install the Calibration Ruler on this feeder, then place feeder to calibration equipment’s position table.

ZK Electronic Technology Co., Limited

How to Test a Mass Flow Sensor?

Technical Library | 2021-10-27 02:20:31.0

The mass flow sensor, or air flow sensor is one of the important sensors of the electronic fuel injection engine. It is installed between the air filter and the intake hose to measure the intake volume of the engine cylinder and adjust the fuel ratio according to it. The mass flow sensor converts the inhaled air flow into electrical signals and sends them to the electronic control unit (ECU). As one of the basic signals to determine the fuel injection, it is a sensor that measures the air flow of the suction engine. So if you want to test it, how should you do? Let's start it.

OKmarts Industrial Parts Mall

How to inspect the temperature recovering time of thermal shock chamber?

Technical Library | 2019-11-12 02:09:22.0

Thermal shock test chamber can be used for testing the chemical change or physical damage on composite materials caused by the thermal expansion and contraction of the sample in the shortest time,which is subjected to extremely and continuous high and low temperature environment.so how to check the temperature recovery time of this chamber? Normally we take following steps to inspect the temepratuire recovering time: 1.Install the temperature sensor at the specified position, and adjust the temperature controller of hot zone and cold zone to the required nominal temperature respectively. 2.The temperature increases and reduces respectively,30min after temperature in two zones reach stable status,record temperature value of the measuring point,pls set the temperature value of two zones to be required nominal temperature. 3.The temperature shock test chamber automatically places the inspected load into theh ot zone,select the corresponding retention time according to regulated standard. 4.Set the transfer time,then the inspection load is transferred from hot zone to cold zone, and the temperature of the measuring point is observed and recorded, and then the reverse conversion of the load from cold zone to hot zone is carried out according to the same method, and the temperature of the measuring point is observed and recorded. www.climatechambers.com

Symor Instrument Equipment Co.,Ltd

  1  

how to install tpsys searches for Companies, Equipment, Machines, Suppliers & Information