Technical Library: icom water heater (Page 1 of 1)

Dust removal in temperature and humidity Test Chamber (2/2)

Technical Library | 2019-05-21 00:21:26.0

Continue to talk about the dust removal from temperature humidity test chamber. Cleaning and maintenance: 1) Pls remove internal impurities inisde chamber before operation. 2) The power distribution room should be cleaned at least once a year, and the dust can be removed by vacuum cleaner. 3) The exterior chamber must also be cleaned more than once a year, which can be wiped with soapy water. Inspection and maintenance of humidifier: The water storage in humidifier should be replaced once a month to ensure clean water quality, humidifying water tray should be cleaned once a month to ensure smooth flow of water. The inspection of over-temperature protector:during the test: If the temperature is over 20 ℃ ~ 30 ℃ than the maximum value setted,the power supply of the heater will stop, the "OVERHEAT" overt-emperature warning light will automatically turn on but the fan is still in operation, if the equipment runs without operator around,the operator should check the over-temperature protector in advance to ensure wether it has been setted properly before start [wet ball over-temperature protector set to 120 ℃].

Symor Instrument Equipment Co.,Ltd

  1  

icom water heater searches for Companies, Equipment, Machines, Suppliers & Information

Pillarhouse USA for Selective Soldering Needs

High Resolution Fast Speed Industrial Cameras.
Voidless Reflow Soldering

High Throughput Reflow Oven
PCB Handling with CE

World's Best Reflow Oven Customizable for Unique Applications
Selective soldering solutions with Jade soldering machine

Nozzles, Feeders, Spare Parts - Siemens, Fuji, Juki, Yamaha, etc...