Technical Library | 2019-05-09 05:40:52.0
When the anti static ic tube is produced, it is empty at both ends. Therefore, before and after the electronic components are loaded into the plastic tube, the IC hoses need to be blocked at both ends. Generally, there are plastic nails and rubber stoppers.
Technical Library | 2010-09-02 13:13:03.0
As chip packaging and interconnectivity have become more dense and operate at higher clock frequencies, physical access for traditional bed-of-nails testing becomes limited. This results in loss of ICT (in-circuit test) fault coverage and higher test fi
Technical Library | 2013-08-07 21:52:15.0
PCB architectures have continued their steep trend toward greater complexities and higher component densities. For quality control managers and test technicians, the consequence is significant. Their ability to electrically test these products is compounded with each new generation. Probe access to high density boards loaded with micro BGAs using a conventional in-circuit (bed-of-nails) test system is greatly reduced. The challenges and complexity of creating a comprehensive functional test program have all but assured that functional test will not fill the widening gap. This explains why sales of automated-optical and automated X-ray inspection (AOI and AXI) equipment have dramatically risen...
1 |