Technical Library: talk (Page 1 of 2)

Dispelling 10 Myths About Nitrogen Reflow

Technical Library | 2011-01-27 16:57:42.0

In this paper, we will talk about reflow in an enclosed oven, although many of these discussions may pertain to wave soldering and even vacuum soldering..

Indium Corporation

Next Best Thing to a Close Shave: Mitigating the Risks of Tin Whiskers

Technical Library | 2010-09-23 18:22:39.0

If you've been in electronics for any length of time, the phenomenon of tin whiskers is something you've likely heard discussed (maybe in scared whispered tones). Tin whiskers certainly aren't a new problem. In fact, some of the first published reports of the occurrence date back to the 1940’s and 1950's. But, over half a century later, we're still talking about it.

Henkel Electronic Materials

Be Vigilant: It’s a Jungle Out There

Technical Library | 2013-04-12 07:22:40.0

Here Chris talks about the pitfalls, the paucity of safe options for manufacturers seeking rare components, and his exasperation with organisations that appear to shelve common sense at the first sign of a shortage. He shares his ‘no nonsense’ approach to getting things right first time, and explains his thinking in establishing an independent distributor focused exclusively on delivering 100% component integrity.

Vigilant Components

Counterfeit Electronic Components: Understanding the Risk

Technical Library | 2012-03-08 20:08:57.0

You may have heard talk in the news lately regarding counterfeit electronic components making it into the US military supply chain. The U.S. Senate Armed Services Committee (SASC) recently reported in the Counterfeit Electronic Parts in the Defense Department Supply Chain hearing held on November 17, 2011, 1,800 cases of suspected counterfeit components that went into more than 1 million individual products. If you consider this number for the military, we can only imagine the number of counterfeits in our commercial yet high reliability products, such as life support or other critical systems. If you are the person within your electronics-based company who must perform risk analyses, counterfeiting is not a new concern, yet many do not realize just how good counterfeiters have become at their "trade".

Trace Laboratories

Assembly and Reliability of 1704 I/O FCBGA and FPBGAs

Technical Library | 2013-03-14 17:19:28.0

Commercial-off-the-shelf ball/column grid array packaging (COTS BGA/CGA) technologies in high reliability versions are now being considered for use in a number of National Aeronautics and Space Administration (NASA) electronic systems. Understanding the process and quality assurance (QA) indicators for reliability are important for low-risk insertion of these advanced electronic packages. This talk briefly discusses an overview of packaging trends for area array packages from wire bond to flip-chip ball grid array (FCBGA) as well as column grid array (CGA). It then presents test data including manufacturing and assembly board-level reliability for FCBGA packages with 1704 I/Os and 1-mm pitch, fine pitch BGA (FPBGA) with 432 I/Os and 0.4-mm pitch, and PBGA with 676 I/Os and 1.0-mm pitch packages. First published in the 2012 IPC APEX EXPO technical conference proceedings.

Jet Propulsion Laboratory

Embedded Passive Technology

Technical Library | 2014-01-09 16:40:33.0

Embedded Passive Technology is a viable technology that has been reliably used in the defense and aerospace industry for over 20 years. Embedded Passive (Resistors and Capacitors) Technology have a great potential for high frequency and high density applications. It also provides better signal performance, reduced parasitic and cross talk. This paper summarizes the selection of resistor embedded materials, evaluations of resistive material (Phase 1) and duplication of a complex digital design (Phase 2). Phase 1 –resistive materials (Foil 25Ω/sq NiCr and 1kΩ/sq CrSiO) and resistive-Ply materials (25Ω/sq and 250Ω/sq NiP) were chosen for evaluation.

Honeywell International

Dust removal in temperature and humidity Test Chamber (2/2)

Technical Library | 2019-05-21 00:21:26.0

Continue to talk about the dust removal from temperature humidity test chamber. Cleaning and maintenance: 1) Pls remove internal impurities inisde chamber before operation. 2) The power distribution room should be cleaned at least once a year, and the dust can be removed by vacuum cleaner. 3) The exterior chamber must also be cleaned more than once a year, which can be wiped with soapy water. Inspection and maintenance of humidifier: The water storage in humidifier should be replaced once a month to ensure clean water quality, humidifying water tray should be cleaned once a month to ensure smooth flow of water. The inspection of over-temperature protector:during the test: If the temperature is over 20 ℃ ~ 30 ℃ than the maximum value setted,the power supply of the heater will stop, the "OVERHEAT" overt-emperature warning light will automatically turn on but the fan is still in operation, if the equipment runs without operator around,the operator should check the over-temperature protector in advance to ensure wether it has been setted properly before start [wet ball over-temperature protector set to 120 ℃].

Symor Instrument Equipment Co.,Ltd

Via In Pad - Conductive Fill or Non-Conductive Fill?

Technical Library | 2020-07-15 18:29:34.0

In the early 2000s the first fine-pitch ball grid array devices became popular with designers looking to pack as much horsepower into as small a space as possible. "Smaller is better" became the rule and with that the mechanical drilling world became severely impacted by available drill bit sizes, aspect ratios, and plating methodologies. First of all, the diameter of the drill needed to be in the 0.006" or smaller range due to the reduction of pad size and spacing pitch. Secondly, the aspect ratio (depth to diameter) became limited by drill flute length, positional accuracy, rigidity of the tools (to prevent breakage), and the throwing power of acid copper plating systems. And lastly, the plating needed to close up the hole as much as possible, which led to problems with voiding, incomplete fill, and gas/solution entrapment.

Advanced Circuits

Why salt spray chamber fail to spray salt mist?

Technical Library | 2019-11-20 22:44:25.0

Salt spray test chamber is used to test teh salt corrosion resistance ability of hardware, metal and other auto parts,the chamber can quickly detect the corrosion resistance degree of products in the temperature, humidity and salt spraying environment, which can effectively improve production efficiency. So what is the reason why such a salt spray test chamber does not spray? As per our past maintenance experience,there are below reasons,customers can have a look,hope it is helpful: 1, the spray tower is blocked; 2, water pipes clogged, water flow can not go in; 3, the air compressor stops running,pls open the air compressor button; 4, main switch of the air compressor outlet is not turned on,pls turn on. 5, the solenoid valve fails, the pressure meter is broken or the pressure is too low, pls check with Climatest and repair it. 6, when the nozzle is clogged, the nozzle should be carefully removed and cleaned,because it is fragile. 7, if the spray pressure is normal, the position of the nozzle glass is also correct, but what is the reason for not spraying? In this case, it is necessary to carefully observe whether there is dirt at the contact surface of the nozzle. If so, clean up the dirt and the spray can be carried out normally. That‘s all we‘re going to talk about today. If you have any questions, follow us on facebook, Please feel free to ask us questions.

Symor Instrument Equipment Co.,Ltd

What causes temperature humidity chamber to alarm?

Technical Library | 2019-12-12 02:43:44.0

Today we discuss the reason that causes temperature humidity chamber to alarm,In most cases, the equipment alarm is caused by the improper operation in the process of use, which mainly includes following reasons:that are refrigeration system, temperature system and circulating system. First, Refrigeration system 1, refrigeration compressor overpressure alarm. If the refrigerant pressure exceeds the set value, it will stop and alarm at the same time. At this time, the fault must be eliminated and then manually reset. 2, short phase power supply, phase sequence alarm. When the external power supply of the equipment is out of phase or the phase sequence is changed, it will stop and alarm at the same time. 3. The circulating cooling water is short of water to alarm. When the water pressure of the cooling circulating water system is insufficient, it will stop and alarm at the same time, and it must wait for the fault to be eliminated and reset at the same time before it could run normally. 4, refrigeration compressor overheating alarm. When the coil of the compressor is overheated and the power supply of the line is not normal, it will stop and alarm at the same time. Second, Temperature system 1, the overtemperature alarm in the chamber. The sensors in the channel and the sample area are equipped with overtemperature protection devices, and there are also overtemperature protecter on the control panel. When the temperature in the working chamber exceeds the setting value on the controller, it will stop and alarm. 2. sample overtemperature protection. When the temperature in the sample area exceeds the protection temperature set by the controller, it will stop and alarm at the same time. The overtemperature protection of the sample is divided into upper limit protection and lower limit protection, which can be set according to the demand, Third,Circulating system 1. The alarm is caused by the overheating of the circulating fan. When the coil of the fan is over-heated, the alarm will be stopped at the same time. 2. The fan over-current alarm. When the current of the fan exceeds the allowable value, the alarm is stopped at the same time, and the normal operation can only be carried out after the fault maintenance of the overcurrent is completed. This is what we talk about today,if you have more questions,let us know.

Symor Instrument Equipment Co.,Ltd

  1 2 Next

talk searches for Companies, Equipment, Machines, Suppliers & Information

Global manufacturing solutions provider

Have you found a solution to REDUCE DISPENSE REWORK? Your answer is here.
2024 Eptac IPC Certification Training Schedule

Software for SMT placement & AOI - Free Download.
thru hole soldering and selective soldering needs

Training online, at your facility, or at one of our worldwide training centers"