Technical Library: water heater (Page 1 of 1)

Dust removal in temperature and humidity Test Chamber (2/2)

Technical Library | 2019-05-21 00:21:26.0

Continue to talk about the dust removal from temperature humidity test chamber. Cleaning and maintenance: 1) Pls remove internal impurities inisde chamber before operation. 2) The power distribution room should be cleaned at least once a year, and the dust can be removed by vacuum cleaner. 3) The exterior chamber must also be cleaned more than once a year, which can be wiped with soapy water. Inspection and maintenance of humidifier: The water storage in humidifier should be replaced once a month to ensure clean water quality, humidifying water tray should be cleaned once a month to ensure smooth flow of water. The inspection of over-temperature protector:during the test: If the temperature is over 20 ℃ ~ 30 ℃ than the maximum value setted,the power supply of the heater will stop, the "OVERHEAT" overt-emperature warning light will automatically turn on but the fan is still in operation, if the equipment runs without operator around,the operator should check the over-temperature protector in advance to ensure wether it has been setted properly before start [wet ball over-temperature protector set to 120 ℃].

Symor Instrument Equipment Co.,Ltd

  1  

water heater searches for Companies, Equipment, Machines, Suppliers & Information

SMT spare parts - Qinyi Electronics

Stencil Printing 101 Training Course
Selective soldering solutions with Jade soldering machine

Wave Soldering 101 Training Course
Equipment Auction Automotive Electronics Supplier - Closure of Tier-One SMT Dvision: (10) ASM & Universal SMT Lines & Feeders Equipment as-new-as 2019! Dek | Koh Young | Speedline | Vitronics | Viscom

Best Reflow Oven
PCB Depanelizers

Low-cost, self-paced, online training on electronics manufacturing fundamentals