Used SMT Equipment | Soldering - Wave
Was used in one shift operation Runtime: 19.003 h Has puched card reader Spray fluxer 3 bottom pre-heat zones 2 convection heating zone 1 Quarz zone 1 Chip wave 1 Delta wave 1 solder pot stand for maintenance position 1 lift for f
Used SMT Equipment | AOI / Automated Optical Inspection
BF - TRISTAR II Descriptif complet :La nouvelle machine automatique d'inspection optique en ligne SAKI BF-TRISTAR 2, permet de réaliser une inspection des deux faces d'une carte en simultanée , équipée de deux blocs d'inspection TOP et BOTTOM de
Used SMT Equipment | Soldering - Reflow
ERSA ETS 330 FOR LEADED SOLDERING! Year 1997. Condition: good FOR ADDITIONAL INFORMATION PLEASE CONTACT WITH ME! Additional pictures: https://www.dropbox.com/sh/hrpp8n7rc7qugt0/AADi9navJOVFa1hqTqrK25fia?dl=0
Used SMT Equipment | Soldering - Wave
Working width: 330 mm (13") Solder module: Type: lead-free double wave solder module Solder volume: approx. 390 kg (860 lb.) LEADFREE approx. 335 kg (739 lb.) lead-free alloy Warm-up time: approx. 2.5 h Preheating length: 1,100 mm (43.3") Fl
Used SMT Equipment | Soldering - Wave
ERSA EWS 330 Wave Soldering Machine Year 2005 Flushing: Spry Preheating: mix between IR and Quartz Pot: Lead-free, Double Wave Alloy used: SACX PLUS 0307 Wave width: 330 mm Equipped with: 3 Trolleys
Used SMT Equipment | Soldering - Wave
ERSA EWS 330 Wave Soldering Machine Flushing: Spry Preheating: mix between IR and Quartz Pot: Lead-free, Double Wave Alloy used: SACX PLUS 0307 Wave width: 330 mm Equipped with: 3 Trolleys.
Used SMT Equipment | Soldering - Wave
ERSA EWS 330 Wave Soldering Machine Year 2005 Flushing: Spry Preheating: mix between IR and Quartz Pot: Lead-free, Double Wave Alloy used: SACX PLUS 0307 Wave width: 450 mm Equipped with: 3 Trolleys
Used SMT Equipment | Soldering - Wave
The following Ersa N-Wave 330 has 2 full solder pots and various spares. It is included in the Manroland Online Auction scheduled for August 27-28 on www.xlineassets.com. This system will be sold to the highest bidder and is current just decommission