Used SMT Equipment | Soldering - Reflow
Vintage: 2000 Details: • 10 Heated zones • 3 Cooling zones • Nitrogen ready • 480vac Condition: Complete and operational Location & Shipping: USA / FOB Availability: Immediate for purchase / 2-4 weeks for shipping
Used SMT Equipment | Soldering - Reflow
Vitronics Reflow Oven Model: XPM3-1030 Vintage: 2007 Low Hours Left To Right Flow Edge Rail & Mesh Belt 10 Heating Zones 3 Cooling Zones Power: 3 x 480V Complete & Operational
Used SMT Equipment | Soldering - Reflow
Details: • 10 Heating Zones • 3 Cooling Zones • Left to Right • Windows XP Operating System • Edge Rail and Mesh Belt • 50 KVA, 3x480, 50/60 Hz • 20” Belt Conveyor • N2 Plumbed Condition: Complete & Operational Location & Shipping: USA/FOB
Used SMT Equipment | Soldering - Reflow
Make: Vitronics Model: XPM3i-1030 Description: Reflow Oven Vintage: 2013 Details: • Windows XP • Nitrogen • Edge Rail & Mesh Belt • Oxygen Analyzer Location & Shipping: USA / FOB Orig
Used SMT Equipment | Soldering - Reflow
Vitronics Soltec XPM2-1030 Reflow Oven Date of Manufacture: 2006 10 Heating Zones 3 Cooling Zones Windows 7 Operating System Air/ Nitrogen Switching Edge Rail Conveyor with Center Board Support Max Temp: 350° C 3 x 480v ~ 3 Ph
Used SMT Equipment | Soldering - Reflow
Vitronics XPM820 Reflow Oven Model: XPM820 Year: 2000 Left to Right Flow Power: 220V 3-Phase Complete & Operational
Used SMT Equipment | Pick and Place/Feeders
Fuji AIm P&P Pacakge with 400+ Feeders, Vitronics Soltec XPM3-1030 Reflow Oven, Asys Conveyors! Make: Fuji Model: AIM Quantity: Three SW: V5.BZA Single lane Machine 1 Vintage: 2006 Heads: 4 @ H12’s, (4) Feeder Trollies Hours: 32
Used SMT Equipment | Soldering - Reflow
FOR SALE: Make: Vitronics Model: XPM2 820 Vintage: 2003 Sw version: 10.01.00.00 • Edge and Mesh • 8 convection heating zones • 2 cooling zones • Auto chain lube system • Air • R to L Condition: complete and operational, as is where is.
Used SMT Equipment | Soldering - Reflow
Vitronics XPM2 reflow oven SW Rev 12.10 Configured: • Edge/ Mesh • Air Condition: Complete and Operational. Available for inspection prior to shipment Availability: Immediate for purchase. Lead time for shipment 3-6 weeks Location/Shipping: