Manufacturer of search and rescue beacons for marine, aviation, military & outdoor markets
Industry Directory | Research Institute / Laboratory / School
The University of Connecticut is a public land-grant research university in Storrs, Connecticut. It was founded in 1881. The primary 4,400-acre campus is in Storrs, Connecticut, approximately a half hour's drive from Hartford and
New Equipment | Assembly Services
utp cable cat5 cat6 network cabling (Rhonda(at)z-crown.com) CAT6 Riser UTP Cable exceeds the EIA/TIA Category 6 performance by significant margins on all parameters. Guaranteed performance in compliance with the most demanding LAN applications su
cat5e cable utp 305m cabling (Rhonda(at)z-crown.com) Product Description Category 5e UTP cables are designed to meet the most advanced UTP horizontal cable applications. Tested up to 350 MHz, the guaranteed performance of this cable far exceeds
Electronics Forum | Fri Jun 18 17:45:30 EDT 1999 | Scott Cook
| This is my second attempt at it. I still own a home near the golf course South of Bentley. You guys can't mean you had your beginnings there. | | Moonman Ah, My moonie buddie......not our beginnings. But I was mid-stroke in the old career. Mike w
Electronics Forum | Wed Jul 02 14:06:57 EDT 2008 | amcross
Thank you, ALL, who have read this ad and shown interest. I've had a few common questions, so thought I might answer them here.. We are in Danville, IL -- 1.5 hours from Indy, 3 hours from Chicago, just 20 minutes from University of Illinois and its
Used SMT Equipment | In-Circuit Testers
Agilent 4284A-001-002-006 The 4284A precision LCR meter is a cost-effective solution for component and material measurement. The wide 20 Hz to 1 MHz test frequency range and superior test-signal performance allow the 4284A to test components to t
Industry News | 2016-06-27 18:19:43.0
Vass, NC – June 28, 2016 – PACE Worldwide is pleased to announce the move of our primary manufacturing location in Southern Pines NC to our new home about 5 minutes away in Vass NC. After 9 years of leasing the Southern Pines facility, PACE has decided to purchase a permanent home, which will serve as Corporate Headquarters. Eric Siegel, PACE President/CEO, explained that “Not only do we own the building within 3 years for less than half the previous monthly lease, the property is on a beautiful 7-acre tract of land that has easy truck access.” The move is scheduled to be complete in mid-July.
Industry News | 2010-12-20 19:39:31.0
Sono-Tek Corporation has purchased the Milton Industrial Park. The Milton Industrial Park, located in Milton, NY, is an improved 3.13 acre parcel of land comprised of five buildings of office/industrial space, with 50,000 square feet of gross leasable floor area.
Parts & Supplies | Assembly Accessories
PIN N210134075AB BLOCK N210092267AA BLOCK N210092269AC BLOCK N210092268AD PLATE N210119172AA PLATE N210118659AA PLATE N210118657AA PLATE N210121934AB PLATE N210121930AC COVER N210134076AC PIN N510020878AA 87MS4-10 PIN N510026246
Career Center | Fort Lauderdale, Florida USA | Production
Manufacturing / SMT Process Engineer ESSENTIAL DUTIES & RESPONSIBILITIES include the following. Others may be assigned. � Conceive, develop, document, and implement manufacturing processes for PCB assembly � Creates and maintains process instruc