Industry Directory | Consultant / Service Provider / Manufacturer
Since 1986, our focus on delivering quality PCB's and Assemblies hasn't changed. Our top priority has always been to understand what the customer values, evaluate their needs and deliver the best-in-class service and products.
Industry Directory | Manufacturer
Nordson Electronics Solutions makes reliable electronics an everyday reality. Our ASYMTEK, MARCH, and SELECT brands deliver precision fluid dispensing, conformal coating, plasma treatment and selective soldering equipment.
New Equipment | Education/Training
PRO-STD-001 Certification Course Schedule Day 1: Advanced Counterfeit Component Detection and Prevention Certification Course, PRO-STD-001, 6 hours. Day 2: Course overview, (4 > Custom Progressive Course This course is taught in two tiers and can
New Equipment | Education/Training
Cable Wire Harness Assemblies Training This 4-day, lectured course is a comprehensive, instructor-level certification that teaches inspection and assembly criteria for all three classes of cable and wire harness assembly. This course is based on the
Electronics Forum | Thu Jul 22 06:33:28 EDT 2004 | Grant
Hi, I wondered how people warmed up solder paste at the start of the days production. I saw some paste mixers at a show, but only saw ones that mixed small solder paste tubs, not tubes. Can you get mixers that handle tubes. They said these mixers a
Electronics Forum | Tue Jul 27 07:58:21 EDT 2004 | mmjm_1099
Hell as for storing the used paste have someone bring in baby jars. Yes I agree thats alot of wasted money if you throw it away every day. Plus since I'm on the subject why not use a bottle warmer? I persoanlly store our paste in a mini-fridge (along
Used SMT Equipment | Pick and Place/Feeders
Vintage: 2005 Version 2.9.15c Hydra Total assembly time: 17 days, 18 hours, 16 minutes, 40 seconds
Used SMT Equipment | Chipshooters / Chip Mounters
We are looking for a FUJI XP143 Placement Machine. Please contact us if you have this equipment for sale. Thanks and have a nice day!
Industry News | 2019-09-12 22:51:52.0
Learn first-hand the experiences, challenges and solutions our leaders are taking to achieve truly smart manufacturing.
Industry News | 2011-01-12 17:48:44.0
GPD Global will highlight its Positive Cavity Displacement (PCD) Dispensing in Booth #6111 at the upcoming Automation and Technology West Expo (ATX), scheduled to take place February 8-10, 2011 at the Anaheim Convention Center in Anaheim, CA.
Parts & Supplies | Pick and Place/Feeders
All sizes available with 30 day warranty starting at $100.00 Email directly for quotes
Parts & Supplies | Pick and Place/Feeders
Quad feeders all sizes in stock complete with 30 day warranty. 8mm - $150.00 12mm -$200.00 16mm -$250.00 24mm -$350.00 32mm -$400.00 Vibes -$150.00 Top plates for vibes -$100.00
Technical Library | 2010-03-25 06:26:37.0
The complexity of Printed Circuit Assembly process is increasing day by day and causing productivity issues in the industry, introducing ultra fine pitch components (pitch less than 15mil) in PCA is a challenge to minimize risk of defects as solder short, dry solder. This paper is focusing on minimizing these defects.
Technical Library | 1999-05-06 13:50:14.0
This paper begins with a historical review of that revolution, from the first integrated circuit to modern very large scale integration (VLSI) technology, and then reviews the development of present-day microelectronics manufacturing technology...
i4.0 Today caught up with Marc Peo of Heller Industries at IPC Apex Expo in San Diego, to discuss the IPC CFX initiative. Check out the rest of the CFX Videos from IPC APEX EXPO 2018 here: CFX Highlights: https://youtu.be/Q7_fWK7_zeA IPC Representati
SESSION HIGHLIGHT: FYI...Fibers, Yarns, and Inks for E-Textile Products by Stephanie Rodgers & Diana Wyman
Training Courses | | | IPC J-STD-001 Specialist (CIS)
The Certified IPC J-STD-001 Specialist (CIS) training focuses on the knowledge and hand skills employees need to produce high-quality soldered interconnections.
Training Courses | | | IPC J-STD-001 Space Specialist (CIS)
The J-STD-001 Space Addendum is an additional optional module for the Certified IPC J-STD-001 CIS (Specialist) program for organizations that are required to meet these additional requirements.
Events Calendar | Wed Oct 20 00:00:00 EDT 2021 - Wed Oct 20 00:00:00 EDT 2021 | ,
Penang Chapter Virtual Vendor & Technical Day
Events Calendar | Tue Oct 17 00:00:00 EDT 2017 - Thu Oct 19 00:00:00 EDT 2017 | Minneapolis, Minnesota USA
IPC Flexible Circuits - HDI Forum
Career Center | Dallas, Texas USA | Management
Oversee the development and day to day activities of a complete manufacturing facility. Full P&L responsibility for the facility and all of it's departments. Grow the business not only in personnel but also in revenue and customers. This position
Career Center | Neptune, New Jersey USA | Quality Control
QC Inspector for Printed Circuit Assemblies Must have experience in visual inspection of surface mount assemblies and must be able to use a microscope. Must be familiar with surface mount packages and IPC-610 inspection requirements. Must be thor
Career Center | Titusville, Florida USA | Human Resources
Interview scheduling via Leo/Zoom, onsite, travel, onboard integration to include directors, HR staffing and interns, Welcome First Day communications, Sterling BGI support, Prehire Covid tracking, I9 administration, college team surge support, Y1X
Career Center | Pune, Maharahtra India | Engineering,Maintenance,Technical Support
SMT Test Engineer/Electrical Automation Engineer. Good exposure on Agilent, Vitrox, Vi tech and TRI Aoi,s Good exposure on agilent ICTS and DAGE X rays.
Lewis & Clark | https://www.lewis-clark.com/product-tag/mydata-spare-parts/page/3/
: MCB ED-2C Board MCU Warranty: 30 Days Price: $1,150.00 Mydata L-29-276-3B XWB3 ED-3B X Wagon Board Make: Mydata Part No: L-29-276-3B Description
Imagineering, Inc. | https://www.pcbnet.com/blog/succeeding-at-on-time-delivery-with-just-in-time-production/
). The idea behind just-in-time production goes back to Ford Motor company’s early days. Although they took their time to implement it