The Master of Industrial Distribution e-Distance Degree Program offers industry professionals the next level of education and experience in distribution. Earn a graduate degree in distribution from Texas A&M - without disrupting operations. The program is delivered through the World Wide Web.
Industry Directory | Consultant / Service Provider
Long distance and Top UP services
New Equipment | Board Handling - Conveyors
product instruction ※PLC control system, Working is stably and reliably ※Easy to operate touch screen control interface ※ Fast, stable and accurate stepper motor moves ※Enclosed design ensure the highest security level ※Customized machine length
New Equipment | Board Handling - Conveyors
product instruction ※PLC control system, Working is stably and reliably ※Easy to operate touch screen control interface ※ Fast, stable and accurate stepper motor moves ※Enclosed design ensure the highest security level ※Customized machine length
Electronics Forum | Mon Jan 22 09:06:21 EST 2001 | jmlasserre
Product concerned: Sdram memory. Due to the net resistor size and shape (0603, the lead of this component is very close to some vial hole. What is the minimum clearance we must have between a component lead and a pad or via ? For the pcb design th
Electronics Forum | Wed Jan 24 18:58:44 EST 2001 | davef
Permit me to recant ... The courtyard around a 0603 resistor should be: * 0.005" along the short edge of the component / pad * 0.010" along the long edge of the component / pad
Used SMT Equipment | THT Equipment
Cycle Rate Max 25,000 cph (0.14 sec. per insertion) Reliability 200 ppm or better Component Types Capacitors, resistors, diodes, jumper wire, etc. Component Specs Component Class I Distance Between Tapes 52.4mm +/- 1.5mm (2.063” +/- 0.059”) Pit
Used SMT Equipment | Pick and Place/Feeders
Make: EKRA Model: X5-36 Vintage: 2012 Details: (2) Print Heads Min. PCB Width: 50.8mm / Max PCB Width: 610mm Min. PCB Length: 80mm / Max. PCB Length: 916mm Min Req. Distance from PCB Edge: 3mm Power: 23
Industry News | 2003-03-12 08:28:44.0
CAM350 Release 8 is aimed at allowing engineering and manufacturing groups to detect and fix potential PCB fabrication problems earlier in the process.
Industry News | 2003-05-08 07:11:45.0
InDigiNet Signs Definitive Commitment Letter With UBC To Acquire 2.5million in Assets and business Interests plus revenues of Universal Broadband Communications.
Parts & Supplies | SMT Equipment
02300575-01 *SUBSTITUTE=00321278 MOTOR CONTROL PC-BO 02300589-01 PROXIMITY SWITCH: POSITION LIFTING TABLE *S=00300589 02300592-01 *SUBSTITUTE=333972 STEPPING MOTOR WIDTH 02300593-01 *SUBSTITUTE=00300593 PROXIMITY SWITCH WI 02300597-01 *SUBSTITUTE
Parts & Supplies | Pick and Place/Feeders
8mm (2mm material distance) feeder, generally with English 0402(1*0.5mm)CHIP Product Code: Feeder ZK Electronic Technology Co., Limited Becky Su M/P: +86 15323874439/18818686907 becky@hysmt.cn Skype: beckysmt Web: www.smt-cn.com
Technical Library | 2012-12-17 22:05:22.0
Package on Package (PoP) has become a relatively common component being used in mobile electronics as it allows for saving space in the board layout due to the 3D package layout. To insure device reliability through drop tests and thermal cycling as well as for protecting proprietary programming of the device either one or both interconnect layers are typically underfilled. When underfill is applied to a PoP, or any component for that matter, there is a requirement that the board layout is such that there is room for an underfill reservoir so that the underfill material does not come in contact with surrounding components. The preferred method to dispensing the underfill material is through a jetting process that minimizes the wet out area of the fluid reservoir compared to traditional needle dispensing. To further minimize the wet out area multiple passes are used so that the material required to underfill the component is not dispensed at once requiring a greater wet out area. Dispensing the underfill material in multiple passes is an effective way to reduce the wet out area and decrease the distance that surrounding components can be placed, however, this comes with a process compromise of additional processing time in the underfill dispenser. The purpose of this paper is to provide insight to the inverse relationship that exists between the wet out area of the underfill reservoir and the production time for the underfill process.
Technical Library | 2016-04-21 14:10:55.0
The world of electronics continues to increase functional densities on products. One of the ways to increase density of a product is to utilize more of the 3 dimensional spaces available. Traditional printed circuit boards utilize the x/y plane and many miniaturization techniques apply to the x/y space savings, such as smaller components, finer pitches, and closer component to component distances.This paper will explore the evolution of 3D assembly techniques, starting from flexible circuit technology, cavity assembly, embedded technology, 3 dimensional surface mount assembly, etc.
02300575-01 *SUBSTITUTE=00321278 MOTOR CONTROL PC-BO 02300589-01 PROXIMITY SWITCH: POSITION LIFTING TABLE *S=00300589 02300592-01 *SUBSTITUTE=333972 STEPPING MOTOR WIDTH 02300593-01 *SUBSTITUTE=00300593 PROXIMITY SWITCH WI 02300597-01 *SUBSTITUTE
Suitable for diversified glass fibre board, FR-4 board, aluminum board, etc, especially for the PCB with components on both sides. If you have any question about the machine, please feel free to contact e-mial : bella@qy-smt.com
Training Courses | | | ESD Control Training Courses
Browse training and certification programs for electrostatic discharge (ESD) control in electronics assembly.
Events Calendar | Thu Mar 18 00:00:00 EDT 2021 - Thu Mar 18 00:00:00 EDT 2021 | ,
India Chapter Webinar: PCBA Process Qualifications
Events Calendar | Tue Nov 09 00:00:00 EST 2021 - Tue Nov 09 00:00:00 EST 2021 | ,
Boston Chapter Hybrid Meeting: OSAAP Shadowboard & Inlay Design Process for LEAN & 5S Applications
Career Center | Danville, Illinois USA | Production
http://jobs-watchfiresigns.icims.com/watchfiresigns_jobs/jobs/candidate/job.jsp?jobid=1005&mode=view Overview: Watchfire Signs is a dynamic, exciting place to work. Our process engineers utilize their required Bachelors of Engineering and required
Career Center | Palmdale, California USA | Quality Control
Plans and conducts activities concerned with the quality control and quality assurance of industrial processes, materials, and products by performing the following duties. Develops and initiates standards and methods for inspection, testing, and eva
Career Center | toronto, toronto Canada | Engineering
Technical Skills • Plan, Design, Implement , Build Electronic Devices according to specifications • Inspect, Diagnose, Repair, Replace, Calibrate, Modified Electronic Devices • Use Blue Prints, Drawings, Diagrams, Measuring instruments Computer Ski
Career Center | Fort Mill, South Carolina USA | Engineering,Maintenance,Research and Development
Have serviced AMF pinspotters both mechanical and electrical sides; included repair of chassis pc boards to component level. 20 years in this field. Have worked in PCB manufacture with old style board populators and Panasert robots Worked in H
ASYMTEK Products | Nordson Electronics Solutions | https://www.nordson.com/fr-fr/products/adhesive-dispensing-systems-products/gp200-remote-metering-station
Station de mesure à distance GP200 Search Arrow Black Arrow Right Arrow Youtube Twitter Facebook Paper Plane LinkedIn Zoom In Grid Envelope Earth Download File - Document 9 Boxes Browser Calendar Chart Click Icon Close
Qinyi Electronics Co.,Ltd | https://www.qy-smt.com/shop/4022-516-05240-distance-bush-210042?page=411&order=name+asc
ASSEMBLEON Distance bush 4022 516 05240 | QYSMT × Home about Us ABOUT US FAQ SMT spare parts SMT surplus equipment SMT peripheral equipments News Contact US 0 0 Sign in contact us Products Distance bush Public Pricelist Public Pricelist Distance bush