New Equipment | Board Handling - Pallets,Carriers,Fixtures
We take pleasure to introduce ourselves as one of the renowned Exporter, Manufacturer & Supplier of Anti-Static ESD Acrylic PMMA Sheet in Shenzhen, Guangdong, China. Properties Test Method Unit Value Physical Properties Density ASTM D792 g/cm³ 1.19 W
The Fire Problem The Flame ProblemThe ever-increasing and widespread use of electronic devices, such as laptops, tablets, personal digital assistants (PDA’s) and smart phones is requiring longer and longer battery life. The batteries become increas
Electronics Forum | Fri Mar 11 18:30:50 EST 2005 | davef
Russ: In December 2003, the European Commission released the following statement: �The commission services have prepared a draft Commission decision establishing maximum concentration values pursuant to Article5(1)(a) of Directive 2002/95/EC. The pr
Electronics Forum | Sun Aug 08 11:15:32 EDT 1999 | Earl Moon
| | Mike, | | | | Got your message and those of others concerning PCB fab supplier evaluation and qualification check lists, etc. I have a severe problem here in WI as I can hardly access the internet, and when I do it is cut off abruptly for no goo
Used SMT Equipment | Board Cleaners
2011 AQ Zero ion board contamination tester available: * 120VAC Power Requirement. * Large Board capacity 24x24 * New OEM All in One Computer with Windows based O/S. * ESD Safe Laminate Work surface with ESD Grounding. *Test Solution (not inclu
Industry News | 2003-05-23 08:24:49.0
Solid cables of up to 35mm2 cross-section now can be connected to PCBs easily, reliably and cost-effectively with the new Power Combicon range of connectors.
Industry News | 2021-12-09 09:26:46.0
Baja Bid is liquidating excess equipment via online auction. The bidding for this event is now open and the closing will begin today at 1:00 pm EST.
Technical Library | 2008-12-11 01:15:56.0
Flame retardants have been around since the Egyptians and Romans used alum to reduce the flammability of wood. Brominated flame retardants (BFRs) first experienced use after World War II as the substitution of wood and metal for plastics and foams resulted in materials that were much more flammable. The widespread use of BFRs initiated in the 1970s with the explosion of electronics and electrical equipment and housings. For the US market, all of these products must conform to the UL 94 flammability testing specifications. In fact, the most common printed circuit board (PCB) in the electronics industry, FR-4, is defined by its structure (glass fiber in an epoxy matrix) and its compliance to UL 94 V0 standard.
Technical Library | 2019-11-17 22:46:45.0
Overview of walk-in temperature and humidity chamber: It also belongs to environmental test equipment, it tests whether the product can resist high temperature, low temperature, humidity, or the physical and chemical changes produced under extreme conditions, the walk-in temperature and humidity chamber volume is large, the product is placed, or a large object can be placed, such as automobile, new energy, television and liquid crystal screen, etc. How to do the routine maintenance of the walk-in temperature and humidity chamber: 1. The wet gauze basically, if there is no special case, s/b usually changed once in 3 months 2. The water channel shall be regularly cleaned, including water cup, water tank, etc., so as to prevent the water from being blocked,affect the humidity test. 3. It is forbidden to test the flammable and explosive products inside working room. 4. Clean the chamber on a regular basis 2. How to operate walk-in temperature and humidity chamber: The operation method is same as standard temperature humidity test chamber,the controller is 7-inch LCD programmable color screen, you only need to setthe temperature point---test time--how many cycles need to be tested, This can be done automatically, and the machine will stop automatically when it is complete. If there is any problem during the operation, the corresponding problem point will be displayed on the machine control screen. Walk-in temperature and humidity chamber is a must equipment for reliability test of Automobile,Aerospace,Electronic parts,etc,the operation and maintenance are easy,it is teh tear down mahcine,Climatest engineers will be dispatched to do on-site support,for instance,we will finish commissioning,train customers how to operate,maintain,welcome to follow our company facebook page:https://www.facebook.com/Climatechambers
Contact Us Sales manager: Mac Xie Mobile: +8618020714662(WhatsApp) Email: at@mooreplc.com Skype: +8618020714662 Contact Us ✭Product Overview✭ The Baker Hughes / Bently Nevada TK3-2E / TK3-2G Calibration Instruments provides a reference mec
Imagineering, Inc. | https://www.pcbnet.com/blog/advantages-and-disadvantages-of-polyimide-pcbs/
aren’t designed for extreme temperatures and can melt (the “FR” designation does not denote that the material is compliant with UL94V-0, the standard for the safety of flammability of plastic materials for parts in devices and appliances testing