Electronics Forum | Fri Sep 01 09:54:02 EDT 2017 | gsmx4321
I get a Timeout waiting for nozzle changer vacuum buildup failure every time I go to run my 1998 GSMx machine. The problems seems to be that once in a while (it seems to be random) the spindle does not line up exactly in the center of the nozzle cha
Electronics Forum | Mon Oct 13 09:22:14 EDT 2014 | rgduval
Deni, Thanks. I managed to do pretty much exactly that. I was able to get the changers to pop up, and check the vacuum on the nozzles. The first two nozzles are very well sealed into the changer (can't move them), but, the balance of the nozzles
| https://www.feedersupplier.com/sale-13119466-193377-smt-screen-printer-parts-dek-board-stop-kit-lip-seal.html
. We provide professional SMT assembly solutions for electronic manufacture factory. 2. We provide cost-effictive SMT pick and Place machine, and SMT Feeder, SMT Nozzles, SMT control boards, Placement head, Stencil wipes and other spare parts for pick and place machine, screen printer, reflow oven. 3
Lewis & Clark | http://www.lewis-clark.com/product-tag/used-smt/page/2/
: Speedline MPM Model: UP2000-HiE Vintage: 2005 Details: 2D Vision 29” x 29” stencil frame size Max PCB size 20” x 16” Programmable Under head Stencil Wipe with Vacuum HiE 4 th Axis movement Front and back Y-Snuggers for PCB hold down Auto conveyor rail adjust Windows Operating System Condition: Complete