Electronics Forum | Fri May 11 15:43:41 EDT 2001 | davef
More information would be helpful. For instance: * Talk about the distribution of the problem, including a single lot or from various lots and over components and component types on the board * Tell us about the board (ie, thickness, type, solder ma
Electronics Forum | Tue May 25 13:03:35 EDT 2010 | jdumont
Hello, I have no experience with CE-1155 but a ton with 1B73. I would say Justin hit it right on the head. 1B73 does not like to be anywhere near silicone residues. We make sure the boards are handled with gloves after wash, before coat. Unfortunat
Industry News | 2018-12-08 03:29:29.0
SMT Dictionary – Surface Mount Technology Acronym and Abbreviation
I.C.T Provide SMT Production Line solutions with Automated Optical Inspection (AOI) AOI is short for Automated Optical Inspection, which is widely used in the electronics industry to check the appearance of PCBA assembly at the back end of the cir
SMTnet Express, October 7, 2021, Subscribers: 26,641, Companies: 11,452, Users: 26,882 Cleaning Before Conformal Coating Cleaning PCBs before conformal coating removes potentially harmful and unknown contaminants from the board
GPD Global | https://www.gpd-global.com/co_website/pdf/doc/Dispense-System-Service-Guide-22290008G.pdf
Procedure Position & Level Machine Tie Downs If the optional tie down clamps (P/N 22201332) are required, the machine may need to be leveled both before and after the tie down procedure. If tie down clamps are NOT required, skip to Level Machine. 1. Prepare