Electronics Forum | Wed Jun 23 18:23:32 EDT 1999 | Tom B.
Even though you may find a pad-pad thru-hole spacing, part body size, orientation, and insertion head tooling clearences may be the deciding factor in spacing. 1. Part body diameter will dictate component centroid spacing. ---[][][][
Electronics Forum | Wed Jun 23 15:49:30 EDT 1999 | Kelly Morris
In the IPC-SM-782 (Surface Mount Design and Land Pattern Standard) it recommends a minimum of .040" between bottomside wavesoldered chip pads. Where might I find a similar IPC recommendation for minimum space between thru-hole pads? Does anyone kno
Industry News | 2018-10-18 08:32:52.0
How to Prevent Solder Ball and Bridging Defects during the SMT Reflow Process
Blackfox Training Institute, LLC | https://www.blackfox.com/ipc-certification/ipc-instructor/ipc-77117721-cit-recertification/
: IPC 7711/7721 manual Instructor notes for training CIS students Access to training materials including visuals and forms To be eligible for recertification, the CIT must have certified a minimum of 5
| https://www.eptac.com/faqs/ask-helena-leo/ask/smt-components-during-reflow-float-off-pads
(adequate side joint length, not violating minimum electrical clearance, etc.). The IPC does not stipulate that the heel needs to be on pad
IPC is the trade association for the printed wiring board and electronics assembly industries.
Training Provider / Events Organizer / Association / Non-Profit
3000 Lakeside Drive, 309 S
Bannockburn, IL USA
Phone: 847-615-7100