Industry Directory | Manufacturer
MY12 w/HYDRA Speedmount. TPSys 2.4.3i. Refurbished by Mydata in 2005. Total assembly hours after refurb is 1,400 hours. SN# 13027. Loaded with TEX, Magazines, Feeders, etc. Currently in operation.
Industry Directory | Equipment Dealer / Broker / Auctions
Online Brokerage House for Used SMT Assembly Equipment
placement machines range from the full-featured, entry level priced, 96 feeder MY9 to the high mix, high volume, 240 feeder MY19. Mydata is famous for flexibility, high mix, ease-of-use, and fast programming yet can place up to 21,000 CPH with the 8
With the MY200 pick-and-place series, we’ve combined the advantages of our high-mix thinking into a flexible, fully integrated solution that works at virtually any volume. The MY200-series contains new and advanced technologies, that give our custo
Used SMT Equipment | Pick and Place/Feeders
Vintage: 2005 Version 2.9.15c Hydra Total assembly time: 17 days, 18 hours, 16 minutes, 40 seconds
Used SMT Equipment | Pick and Place/Feeders
Software: 2.9.x T3 Linear Table Electrical Two-Pole Test Electrical Transistor Test Optical Centering Conveyor Shared Databases Hydra Z High Speed Hydra High Speed Autoteach Linescan for Z Line Mode Fast Place Sequence
Industry News | 2021-05-25 08:27:28.0
Baja Bid will be liquidating excess and unused assets via online auction. Featuring: 2018 Mycronic MY300SX-11 SMT Pick & Place, 2005 Mydata MY9 SMT Pick & Place, Mydata Agilis Magazines and Feeders, 2010 Universal GX-11S SMT Pick & Place and much more.
Industry News | 2021-05-17 09:12:49.0
Baja Bid will be liquidating excess and unused assets via online auction. The bidding for this event will open promptly at 8:00am EST on June 7th and the closing will begin at 1:00 pm EST on June 9th.
Software Version 4.2.4e Electrical two-pole test Electrical transistor test Shared databases Hydra Electrical measurement Hydra high speed Line mode Fast place sequence Hydra large component range Hydra fine pitch In/Out conveyor board trai
Career Center | Montreal, Quebec Canada | Production
Position Description: (P03) SMT Operator Reports to: Production Manager Department: Manufacturing Job Description: Operate equipment related to surface mount assembly. Responsibilities: • Operate equipment in SMT department. • Insure that established
Career Center | Clifton, New Jersey USA | Engineering,Production
L3Harris is seeking an engineer to lead manufacturing and space vehicle integration related activities on the GPSIIIF and NTS3 program. The type of space flight hardware produced at this L3Harris location includes complex circuit card assemblies (CCA
L3 Communications, Telemetry and Instrumentation-LP Harris Technology
Career Center | Palm bay, Florida USA | Engineering,Maintenance,Production
12 years ems manufacturing experience. long-familiar with the operation, maintanance, programming, and troubleshooting of: uic 4790,91,92,95,96,97 smt chipshooter. uic gsm1,gsm2, gdm platform smt fuji gl,cp4,cp5, cp6-4, ip2 mydata tp9, tp11, my9,
Career Center | Spokane, Washington USA | Engineering,Maintenance,Management,Production,Quality Control,Research and Development,Technical Support
Team Lead direct, communicate and meet or exceed scheduled work as a team create/Update history reports and graphs to show improvements and problem areas keep track of scrap parts update inventory. Maintain Process and improvements. Programmer Using
| https://pcbasupplies.com/smt-equipment-mycronic-mydata-hydra-tools/
Hydra Tools Login Create Account Contact View My Cart Menu × Categories Hand Soldering & Rework Automation Tooling PCB Support Systems Soldering Robots Material Handling Dry Storage Cabinets Component Handling Selective Solder Nozzles Pick
1st Place Machinery Inc. | http://www.firstplacemachinery.com/firstplace_mydata_my9.html
Mydata MY9 Mydata MY9 Pick and Place Equipment Description Mydata Model Number: MY9 Serial Number: 5256 Hydra Head Dual Vision Linescan Software Version TPSys 2.9.21d (9