Electronics Forum | Wed Feb 16 21:51:29 EST 2000 | Dave F
Kurt: Lots of choices, not many of them good, yano. 1 So LPI has taken over the market pretty nearly 100%, but it won't "tent" reliably, because it is not very viscous when applied and drops into the hole. So then, tenting/plugging with LPI is bad
Electronics Forum | Wed Feb 16 21:51:29 EST 2000 | Dave F
Kurt: Lots of choices, not many of them good, yano. 1 So LPI has taken over the market pretty nearly 100%, but it won't "tent" reliably, because it is not very viscous when applied and drops into the hole. So then, tenting/plugging with LPI is bad
Industry News | 2018-12-08 03:29:29.0
SMT Dictionary – Surface Mount Technology Acronym and Abbreviation
Imagineering, Inc. | https://www.pcbnet.com/blog/hdi-pcb-advantages-and-applications/
. Managed Conductivity Vias can then be filled with conductive or non-conductive materials to facilitate transmission between components depending on your board design
Heller Industries Inc. | https://hellerindustries.com/wp-content/uploads/2018/07/last-will-of-bga-void.pdf
. These voids are the result of assembly process issues and do not have material or design root causes. Macro voids are due to assembly variation that can be eliminated with matched material and consistent process parameter selection/control